|
---|
Category:Letter
MONTHYEARNL-24-0385, Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator2024-10-31031 October 2024 Request for Action Matrix Deviation Due to Recent Events Impacting the Unplanned Scram with Complications Performance Indicator IR 05000424/20240032024-10-30030 October 2024 – Integrated Inspection Report 05000424/2024003 and 05000425/2024003 NL-24-0392, Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-0022024-10-28028 October 2024 Response to Requests for Additional Information Related to Proposed Alternative GEN-ISI-AL T-2024-002 NL-24-0386, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information2024-10-28028 October 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks Response to Request for Additional Information NL-24-0366, Core Operating Limits Report, Cycle 26, Version 12024-10-25025 October 2024 Core Operating Limits Report, Cycle 26, Version 1 ML24297A6482024-10-23023 October 2024 5 to the Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Report ML24269A2502024-09-26026 September 2024 Acknowledgement of the Withdrawal of the Requested Exemption and License Amendment Request to Remove Tier 1 and Tier 2* Requirements NL-24-0350, Core Operating Limits Report, Cycle 24, Version 22024-09-25025 September 2024 Core Operating Limits Report, Cycle 24, Version 2 NL-24-0369, Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements2024-09-25025 September 2024 Withdrawal of License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2 Requirements ML24243A0072024-09-10010 September 2024 – Correction of Amendment Nos. 223 and 206 Regarding Revision to Technical Specifications to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24102A2642024-09-0909 September 2024 – Exemption Request Regarding Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0013) - Letter ML24249A2942024-09-0606 September 2024 Correction of Amendment Nos. 218 and 201 Regarding Revision to Technical Specifications to Use Online Monitoring Methodology 05200025/LER-2024-002, Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve2024-09-0505 September 2024 Manual Reactor Protection System and Automatic Safeguards Actuation Due to an Unexpected Change in Position of a Main Feedwater Pump Minimum Flow Control Valve IR 05000424/20240052024-08-26026 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 - Report 05000424/2024005 and 05000425/2024005 ML24235A1952024-08-22022 August 2024 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 3 and 4 - Report 05200025/2024005 and 05200026/2024005 IR 05000424/20244012024-08-15015 August 2024 4 - Security Baseline Inspection Report 05000424-2024401, 05000425-2024401, 05200025-2024402, and 05200026-2024403 - Cover Letter NL-24-0299, Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information2024-08-14014 August 2024 Exemption Request: Final Safety Analysis Report Update Schedule, Response to Request for Additional Information 05000425/LER-2024-001, Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod2024-08-0909 August 2024 Manual Actuation of the Reactor Protection System Due to a Rod Control Fuse Opening Causing a Misaligned Shutdown Rod ML24218A1842024-08-0707 August 2024 Examination Report and Cover Letter 05200026/LER-2024-001, Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal2024-08-0606 August 2024 Manual Reactor Protection System Actuation Due to Procedure Not Optimally Sequenced to Reset the Rapid Power Reduction Signal ML24212A1442024-08-0101 August 2024 Integrated Inspection Report 05200025/2024002 and 05200026/2024002 IR 05000424/20240022024-07-29029 July 2024 Integrated Inspection Report 05000424/2024002 and 05000425/2024002 IR 05000424/20244042024-07-26026 July 2024 Material Control and Accounting Program Inspection Report 05000424/2024404 and 05000425/2024404 (Cover Letter) NL-24-0126, – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.62024-07-25025 July 2024 – Units 3 and 4, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Action a and SR 3.7.6.6 NL-24-0282, License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements2024-07-25025 July 2024 License Amendment Request and Exemption Request: Remove Tier 1 and Tier 2* Requirements ML24204A0722024-07-23023 July 2024 Issuance of Amendment No. 225, Regarding LAR to Revise TS 3.7.9 for a one-time Change to Support Nuclear Service Cooling Water Transfer Pump Repairs - Emergency Circumstances NL-24-0286, Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair2024-07-20020 July 2024 Emergency Request to Revise Technical Specification 3.7.9 for a One-Time Change to Support a Unit 1 Nuclear Service Cooling Water Transfer Pump Repair ML24191A4562024-07-19019 July 2024 Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24194A0342024-07-12012 July 2024 Review of the Refueling Outage 1R24 Steam Generator Tube Inspection Report ML24191A3792024-07-10010 July 2024 – Initial Test Program and Operational Programs Inspection Report 05200026/2024011 NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0087, License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks2024-06-21021 June 2024 License Amendment Request: Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Air Storage Tanks NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0243, Registration of Spent Fuel Cask Use2024-06-18018 June 2024 Registration of Spent Fuel Cask Use ML24163A0632024-06-12012 June 2024 2024 Licensed Operator Re-qualification Inspection Notification Letter Vogtle, Units 3 & 4 ML24155A1772024-06-0505 June 2024 Regulatory Audit in Support of Review of the LAR to Revise Emergency Diesel Generator Frequency and Voltage Ranges for Technical Specification 3.8.1, Surveillance Requirements NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24094A1402024-05-16016 May 2024 Staff Response to Request for Revision to NRC Staff Assessment of Updated Seismic Hazard Information and Latest Understanding of Seismic Hazards at the Vogtle Plant Site Following the NRC Process for the Ongoing Assessment of Natural Hazard ML24130A2412024-05-13013 May 2024 Integrated Inspection Report 05200025/2024001 and 05200026/2024001 ML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24101A2112024-05-11011 May 2024 Expedited Issuance of Amendment No. 198 Change to Technical Specification 5.5.13, Ventilation Filter Testing Program (VFTP) NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 ML24127A2372024-05-0909 May 2024 Initial Test Program and Operational Programs Inspection Report 05200026/2024010 NL-24-0194, Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1)2024-05-0707 May 2024 Revised Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03-R1) ML24120A2832024-04-30030 April 2024 Project Manager Reassignment 2024-09-09
[Table view] Category:License-Combined License (COL) (New/Renewal/Amendments) DKT 52
MONTHYEARML23243B0542023-12-19019 December 2023 VEGP Unit 4 Amendment No. 193 - Enclosure 2 ML23243A9682023-12-19019 December 2023 VEGP Unit 3 Amendment No. 197 - Enclosure 1 ML23310A2922023-12-0707 December 2023 Issuance of Amendment for Exception to Regulatory Guide 1.163, LAR 23 007 ML23339A1812023-12-0707 December 2023 Correction Letter Regarding License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 ML23289A1632023-11-28028 November 2023 Letter and Amendment 195 and 192 LAR-23-006R1 TS 3.1.9 More Restrictive Action ML23159A0972023-07-31031 July 2023 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 23-001) ML23072A2722023-05-0101 May 2023 Enclosure 1 - LAR 22-005 Amendment No. 191 Vogtle Unit 3 ML23072A2732023-05-0101 May 2023 Enclosure 2 - LAR 22-005 Amendment No. 188 Vogtle, Unit 4 ML23072A2762023-05-0101 May 2023 Attachment to Enclosure 2 - VEGP U4 Amendment 188 LAR-22-005 ML23037A0892023-02-0808 February 2023 Amendment - Vogtle Unit 3 Amendment No. 190, Tech Spec Exceptions for In-Containment Refueling Water Storage Tank Operability Prior to Initial Criticality (Exigent Circumstances) ML20290A2822022-08-0303 August 2022 Finding That Acceptance Criteria in the Combined License Are Met (10 CFR 103g - Finding) ML21237A2342021-10-15015 October 2021 Amendment Unit 3 - Vogtle Electric Generating Plant LAR 21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2352021-10-15015 October 2021 Attachment Unit 3 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2372021-10-15015 October 2021 Attachment Unit 4 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21237A2362021-10-15015 October 2021 Amendment Unit 4 - Vogtle Electric Generating Plant LAR-21-001: Clarification of ITAAC Regarding Invessel Components ML21217A0242021-09-17017 September 2021 Amendment No. 187 - Vogtle Electric Generating Plant Unit 3 ML21217A0252021-09-17017 September 2021 Amendment No. 185 - Vogtle Electric Generating Plant Unit 4 ML21217A0272021-09-17017 September 2021 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment No. 185 ML21217A0262021-09-17017 September 2021 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment No. 187 ML20314A0132020-12-0707 December 2020 License Amendment - Vogtle Electric Generating Plant Unit 4 (LAR 20-005) ML20314A0142020-12-0707 December 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 184 (LAR-20-005) ML20314A0102020-12-0707 December 2020 License Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 20-005) ML20314A0112020-12-0707 December 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 186 (LAR-20-005) ML20247J4612020-10-14014 October 2020 Amendment 183 - Vogtle Electric Generating Plant Unit 4 (LAR 20-004) ML20247J4592020-10-14014 October 2020 Amendment 185 - Vogtle Electric Generating Plant Unit 3 (LAR 20-004) ML20237F4922020-09-24024 September 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 184 (LAR-20-003) ML20237F4942020-09-24024 September 2020 Attachment - Vogtle Electric Generating Plant Unit 4 Amendment 182 (LAR-20-003) ML20237F4932020-09-24024 September 2020 Amendment - Vogtle Electric Generating Plant Unit 4 (LAR 20-003) ML20237F4912020-09-24024 September 2020 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 20-003) ML20196L6772020-08-11011 August 2020 Attachment - Vogtle Electric Generating Plant Unit 3 Amendment 183 for LAR-20-002 ML20196L6782020-08-11011 August 2020 Amendment 181 - Vogtle Electric Generating Plant Unit 4 for LAR 20-002 ML20196L6792020-08-11011 August 2020 Attachment - Vogtle Electric Generating Plant Unit 4 for Amendment 181 for LAR-20-002 ML20132A0762020-08-0404 August 2020 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR 20-001) ML20059N7792020-05-12012 May 2020 Amendment 181 - LAR-19-010: Auxiliary Building Room Heatup ML20059N7822020-05-12012 May 2020 Amendment 180 - LAR-19-010: Auxiliary Building Room Heatup ML20106F1632020-05-12012 May 2020 Attachment to Amendment 180 - LAR-19-010: Auxiliary Building Room Heatup ML20106F1622020-05-12012 May 2020 Attachment to Amendment 181 - LAR-19-010: Auxiliary Building Room Heatup ML20120A0072020-04-30030 April 2020 Attachment for Amendment 178 Cyber Security Plan Changes (LAR-19-020) ML20106F1592020-04-30030 April 2020 Attachment for Amendment 179 Cyber Security Plan Changes (LAR-19-020) ML20057E1172020-04-30030 April 2020 Amendment 178 - Issuance of Amendments for Cyber Security Plan Changes (LAR-19-020) ML20057E1062020-04-30030 April 2020 Amendment 179 - Issuance of Amendments for Cyber Security Plan Changes (LAR-19-020) ML20064E6682020-03-23023 March 2020 Enclosure 4: Supplemental Attachment to License Amendment No. 148 for COL No. NPF-91 ML20064E6802020-03-23023 March 2020 Enclosure 5: Supplemental Attachment to License Amendment No. 147 for COL No. NPF-92 ML20064E5722020-03-23023 March 2020 Supplemental Attachment to License Amendment No. 36 for COL No. NPF-92 ML20064E6122020-03-23023 March 2020 Enclosure 2: Supplemental Attachment to License Amendment No. 125 for COL No. NPF-91 ML20064E6282020-03-23023 March 2020 Enclosure 3: Supplemental Attachment to License Amendment No. 124 for COL No. NPF-92 ML20013G6882020-02-0303 February 2020 Amendment - Vogtle Electric Generating Plant Unit 4 ML19350C7002020-01-28028 January 2020 Attachment - Vogtle Electric Generating Plant Unit 3 (LAR 19-015).d ML19350C7142020-01-28028 January 2020 Amendment - Vogtle Electric Generating Plant Unit 4 (LAR 19-015) ML19350C6862020-01-28028 January 2020 Amendment - Vogtle Electric Generating Plant Unit 3 (LAR 19-015) 2023-07-31
[Table view] Category:Proprietary Information Review
MONTHYEARML24120A1812024-05-13013 May 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage IR24 Steam Generator Tube Inspection Report – Enclosure 2 ML24029A0592024-01-30030 January 2024 Request for Withholding Information from Public Disclosure Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report – Enclosure 2, GAE-NRCD-RF-LR-000002 P-Attachment, Rev. 0 ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) ML23234A2352023-09-0808 September 2023 Request for Withholding Information from Public Disclosure Notification of Full Compliance of Required Action for NRC Order EA-12-049 Mitigation Strategies for Beyond-Design-Basis External Events ML23205A0612023-07-27027 July 2023 Response to Request for Withholding Proprietary Information from Public Disclosure for the Vogtle Electric Generating Plant Enclosure 2 to SNC Letter NL-23-0611 for Unit 4, Core Operating Limits Report, Cycle 1, Version 1 ML23024A1102023-02-0303 February 2023 Request for Withholding Informatio from Public Disclosure License Amendment Req. and Ex to Allow Use of Lead Test Assemblies for Accident Tolerant Fuel Encl 2, Response to NRC Audit Questions Related to Hbhe Lta. ML22297A0242022-10-26026 October 2022 Resp to Req for Withholding Proprietary Info from Public Disclosure for Vogtle 3 and 4, ENC 2 and 4 to SNC Letter ND-22-0817, Req for Alternative (VEGP 3&4-ISI1-ALT-17) ML22266A0492022-09-28028 September 2022 Request for Withholding Info from Public Disclosure LAR and Exemptions to Allow Use of LTAs for ATF - Encl. 1, SNC Response to Requests for Additional Info Attachment 2 Proprietary Response to Questions 2-6 EPID L-2022-LLA-0097 ML22251A3482022-09-16016 September 2022 Request for Withholding Info. from Public Disclosure for Slides in the Closed Session of the Pre-Submittal Meeting Regarding the Proposed Online Monitoring License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 EPID L ML22234A0692022-09-15015 September 2022 Request for Withholding Info from Public Disclosure LAR and Exemptions to Allow Use of LTAs for ATF - Enclosure 1, Evaluation of the Proposed Change (Proprietary) EPID L-2022-LLA-0097, LLE-0020, LLE-0021, LLE-0022 ML22255A2032022-09-0202 September 2022 AMS Affidavit for SNC Slides - Pre-Submittal Meeting on September 13, 2022 - Vogtle Online Monitoring LAR ML21270A0212021-10-14014 October 2021 Request for Withholding Information from Public Disclosure WCAP-18647-P, Rev. 0, Technical Basis for Westinghouse Embedded Flaw Repair of the Reactor Vessel Head Penetrations ML21061A2842021-03-0808 March 2021 Request for Withholding Information from Public Disclosure for the Vogtle Electric Generating Plant, Unit 3 Core Operating Limits Report, Cycle 1, Version 3 ML20364A1932020-12-30030 December 2020 Response to Request for Withholding Proprietary Information from Public Disclosure for the Vogtle Electric Generating Plant, Units 3 and 4 Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds ML19283C9322019-10-16016 October 2019 Request for Withholding Information from Public Disclosure, Vogtle Electric Generating Plant Units 3 and 4, Related to Request for License Amendment Regarding Protection and Safety Monitoring Revision (LAR-19-001) ML18282A0772018-10-11011 October 2018 Request for Withholding Proprietary Information from Public Disclosure for the Vogtle Electric Generating Plant, Units 3 and 4 (LAR 17-043S1) ML18123A2592018-05-0202 May 2018 Request for Withholding of Proprietary Information from Public Disclosure (ND-18-0853) ML18082A4942018-03-27027 March 2018 Request for Withholding Proprietary Information from Public Disclosure - Vogtle Electric Generating Plant, Units 3 and 4 (LAR 17-028S1) ML18073A1672018-03-19019 March 2018 LAR-17-030 - Proprietary Letter ML18073A1662018-03-19019 March 2018 LAR-17-030S1 - Proprietary Letter Supplement 1 ND-18-0300, Westinghouse Electric Co., Application for Withholding Proprietary Information from Public Disclosure2018-02-27027 February 2018 Westinghouse Electric Co., Application for Withholding Proprietary Information from Public Disclosure ML18033A6712018-02-0909 February 2018 Proprietary Letter (LAR-17-043) ML17310A1012017-11-0808 November 2017 Request for Withholding Information from Public Disclosure ML17191A5702017-07-24024 July 2017 Request for Withholding Information from Public Disclosure ML17191A6912017-07-24024 July 2017 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 ML17191A8332017-07-24024 July 2017 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 ML15051A3302015-02-27027 February 2015 Request for Withholding Information from Public Disclosure ML12111A0352012-04-26026 April 2012 Request for Withholding Information from Public Disclosure ML11355A1182012-01-12012 January 2012 Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 ML11103A0682011-05-18018 May 2011 (Vogtle 1 and 2) - Request for Withholding Information from Public Disclosure ML1106902472011-05-16016 May 2011 Request for Withholding Information from Public Disclosure (Tac Nos. ME5067 and ME5068) ML0806504772008-08-0606 August 2008 Request for Withholding Information from Public Disclosure (TAC Nos. MD4727 and MD4728) NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 4, Westinghouse Letter, CAW-08-2449, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice2008-06-23023 June 2008 Vogtle, Units 1 and 2 - Enclosure 4, Westinghouse Letter, CAW-08-2449, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 7, Westinghouse Letter, CAW-08-2448, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice2008-06-23023 June 2008 Vogtle, Units 1 and 2 - Enclosure 7, Westinghouse Letter, CAW-08-2448, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice ML0818202162008-06-23023 June 2008 Enclosure 7, Westinghouse Letter, CAW-08-2448, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice ML0818202102008-06-23023 June 2008 Enclosure 4, Westinghouse Letter, CAW-08-2449, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice ML0809503362008-04-0707 April 2008 Request for Withholding Information from Public Disclosure ML0806605122008-03-10010 March 2008 Request for Withholding Information from Public Disclosure, Response to Request for Additional Information Regarding Technical Specifications 3.3.2 and 3.5.4, MD7772 and MD7773 ML0805200492008-02-28028 February 2008 Request for Withholding Information from Public Disclosure ML0728400822007-10-25025 October 2007 Request for Withholding Information from Public Disclosure (TAC Nos. MD6625 and MD6626) ML0728400172007-10-25025 October 2007 Request for Withholding Information Public Disclosure ML0618003642006-06-28028 June 2006 Westinghouse Electric Company, Request for Withholding Information from Public Disclosure for Vogtle Electric Generating Plant, Units 1 and 2 ML0527906462005-10-20020 October 2005 Withholding Information from Public Disclosure, Tac Nos. MC5863 and MC5864 2024-05-13
[Table view] |
Text
October 16, 2019 Mr. James A. Gresham, Manager Mr. Brian H. Whitley, Director Regulatory Compliance Regulatory Affairs Westinghouse Electric Company Southern Nuclear Operation Company, Inc.
1000 Westinghouse Drive, 3535 Colonnade Parkway, Building 3, Suite 310 Bin N-226-EC Cranberry Township, PA 16066 Birmingham, AL 35243
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4, RELATED TO REQUEST FOR LICENSE AMENDMENT REGARDING PROTECTION AND SAFETY MONITORING SYSTEM SURVEILLANCE REQUIREMENT REDUCTION TECHNICAL SPECIFICATION REVISION (LAR-19-001 (WESTINGHOUSE CAW-19-4955))
Dear Mr. Gresham and Mr. Whitley:
By letter dated October 7, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19280E414), Southern Nuclear Operating Company (SNC) submitted affidavits in Enclosures 12 and 13, dated October 7, 2019, signed by Mr. Brian H. Whitley and Mr. Zachary S. Harper, respectively, requesting the information contained in Enclosure 8 be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390. Enclosure 9 of the October 7, 2019, letter provides the non-proprietary version of Enclosures 8.
The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) The information sought to be withheld from public disclosure is owned and has been held in confidence by SNC and Westinghouse Electric Company (Westinghouse);
(b) The information is of a type customarily held in confidence by SNC and Westinghouse and not customarily disclosed to the public.
(c) The release of the information might result in the loss of an existing or potential competitive advantage to SNC and/or Westinghouse.
(d) The information reveals the distinguishing aspects of a process (or component, structure, tool method, etc.) where prevention of its use by any of Westinghouses competitors without license from Westinghouse constitutes a competitive advantage over other companies.
(e) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
J. Gresham B. Whitley (f) The information was transmitted to the Commission in confidence under the provisions of 10 CFR 2.390.
(g) Public disclosure of the information is likely to cause substantial harm to the competitive position of Westinghouse and would enhance the ability of competitors to provide similar technical evaluation justification and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390, and on the basis of the statements in the affidavits, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1530.
Sincerely,
/RA/
Jennivine Rankin, Project Manager Vogtle Project Office Office of Nuclear Reactor Regulation Docket Nos.: 52-025 52-026 cc: See next page
ML19283C932 NRO-008 OFFICE VPO/PM VPO/LA VPO/BC VPO/PM NAME JRankin (c) RButler VHall JRankin (s)
DATE 10/15/19 10/11/19 10/16/19 10/16/19 Vogtle Units 3 & 4 Mailing List (Revised 08/13/2019) cc:
Southern Nuclear Operating Company, Inc. Resident Inspector Document Control Coordinator Bin N-226-EC Vogtle Plant Units 3 & 4 3535 Colonnade Parkway 8805 River Road Birmingham, AL 35243 Waynesboro, GA 30830 Office of the Attorney General Mr. Barty Simonton 40 Capitol Square, SW Team Leader Atlanta, GA 30334 Environmental Radiation Program Air Protection Branch Resident Manager Environmental Protection Division Oglethorpe Power Corporation 4244 International Parkway, Suite 120 Alvin W. Vogtle Nuclear Plant Atlanta, GA 30354-3906 7821 River Road Waynesboro, GA 30830 Brian H. Whitley 3535 Colonnade Parkway, Bin N-226-EC Anne F. Appleby 42 Inverness Center Parkway, BIN B237 Olgethorpe Power Corporation Birmingham, AL 35243 2100 East Exchange Place Tucker, GA 30084 Mr. Michael Yox Site Regulatory Affairs Director County Commissioner Vogtle Units 3 & 4 Office of the County Commissioner 7825 River Road, Bin 63031 Burke County Commission Waynesboro, GA 30830 Waynesboro, GA 30830 Mr. Wayne Guilfoyle Commissioner District 8 Augusta-Richmond County Commission 4940 Windsor Spring Rd Hephzibah, GA 30815 Gwendolyn Jackson Burke County Library 130 Highway 24 South Waynesboro, GA 30830 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission Atlanta, GA 30334 Page 1 of 3
Vogtle Units 3 & 4 Mailing List Email acchambe@southernco.com (Amy Chamberlian) agaughtm@southernco.com (Amy Aughtman) awc@nei.org (Anne W. Cottingham) becky@georgiawand.org (Becky Rafter) bhwhitley@southernco.com (Brian Whitley)
Bill.Jacobs@gdsassociates.com (Bill Jacobs) bjadams@southernco.com (Brad Adams) bwwaites@southernco.com (Brandon Waites) castelca@westinghouse.com (Curtis Castell) comerj@westinghouse.com (James Comer) crpierce@southernco.com (C.R. Pierce) dahjones@southernco.com (David Jones) david.hinds@ge.com (David Hinds) david.lewis@pillsburylaw.com (David Lewis) dgbost@southernco.com (Danny Bost) dlfulton@southernco.com (Dale Fulton) drculver@southernco.com (Randy Culver) durhamdc@westinghouse.com (David Durham) ed.burns@earthlink.net (Ed Burns) edavis@pegasusgroup.us (Ed David) erg-xl@cox.net (Eddie R. Grant) fdhundle@southernco.com (Forrest Hundley) fhwillis@southernco.com (Fred Willis)
G2NDRMDC@southernco.com (SNC Document Control)
George.Taylor@opc.com (George Taylor) graysw@westinghouse.com (Scott W. Gray) jadwilli@southernco.com (J.D. Williams) james1.beard@ge.com (James Beard) jantol1dj@westinghouse.com (David Jantosik) jenmorri@southernco.com (Jennifer Buettner)
JHaswell@southernco.com (Jeremiah Haswell) jim@ncwarn.org (Jim Warren)
John.Bozga@nrc.gov (John Bozga)
Joseph_Hegner@dom.com (Joseph Hegner) jpredd@southernco.com (Jason R. Redd) karen.patterson@ttnus.com (Karen Patterson) karlg@att.net (Karl Gross) kmstacy@southernco.com (Kara Stacy) kroberts@southernco.com (Kelli Roberts)
KSutton@morganlewis.com (Kathryn M. Sutton) kwaugh@impact-net.org (Kenneth O. Waugh) markus.popa@hq.doe.gov (Markus Popa) mdmeier@southernco.com (Mike Meier) media@nei.org (Scott Peterson)
Page 2 of 3
Vogtle Units 3 & 4 Mailing List Melissa.Smith@Hq.Doe.Gov (Melissa Smith) mike.price@opc.com (M.W. Price)
MKWASHIN@southernco.com (MKWashington) mlgraves@southernco.com (Michelle Graves)
MSF@nei.org (Marvin Fertel) myox@southernco.com (Mike Yox) nirsnet@nirs.org (Michael Mariotte)
Nuclaw@mindspring.com (Robert Temple)
Paul@beyondnuclear.org (Paul Gunter) pbessette@morganlewis.com (Paul Bessette) r.joshi15@comcast.net (Ravi Joshi)
Ronald.Jones@scana.com (Ronald Jones) rwink@ameren.com (Roger Wink) sabinski@suddenlink.net (Steve A. Bennett) sara@cleanenergy.org (Sara Barczak) sblanton@balch.com (Stanford Blanton)
Shiva.Granmayeh@hq.doe.gov (Shiva Granmayeh) sjackson@meagpower.org (Steven Jackson) skauffman@mpr.com (Storm Kauffman) sroetger@psc.state.ga.us (Steve Roetger) stephen.burdick@morganlewis.com (Stephen Burdick) tom.miller@hq.doe.gov (Tom Miller)
TomClements329@cs.com (Tom Clements)
Vanessa.quinn@dhs.gov (Vanessa Quinn) vcsummer2n3@gmail.com (Brian McIntyre) wasparkm@southernco.com (Wesley A. Sparkman) wayne.marquino@gmail.com (Wayne Marquino) weave1dw@westinghouse.com (Doug Weaver)
William.Birge@hq.doe.gov (William Birge) x2gabeck@southernco.com (Gary Becker) x2kmseib@southernco.com (Kristin Seibert)
Page 3 of 3