Advises That Addl Matl for Use in Preparing Operator Exam Was Given to Biles & Carouthers During 590826-27 Site Visit
ML19282D433
Person / Time
Site: Dresden Constellation icon.png
Issue date: 08/28/1959
From: Haaga J
GENERAL ELECTRIC CO.
To: Fleury E
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 8008110571
Download: ML19282D433 (2)


Text

(

t "G EN ER AL $ ELECTRIC 2

COMPANY ATOMIC POWER EQUIPMENT DEPARTMENT SAN JOSE. CALIF.

TELEPHONE CYPRESS 7 3000 2151 SOUTH FIR $1 STREET.

P. O. B O X 2 5 4 e

Reply to:

P. O. Box 150 Morris, Illinois August 28, 1959 Mr. E. R. Fleury Assistant Chief, Licensing Branch Division of Licensing and Regulation United States Atomic Energy Commission Washington 25, D. C.

Dear Mr. Fleury:

Drs. Biles and Carouthers were at the Dresden site cn August 26 and 27 During their visit, we submitted to them the following additional material for tneir use in preparing the operator's examinations:

Volume 2 - Steam Generation Chapter V - Fuel Handling (Procedure only)

Volume 5 - Electrical control and Instrumentation Chapter V - Control and Instrumentation Systems (Rough Draft)

Volume 6 Operating Procedures Chapter III - A Refueling Operation C - Control Rod Replacement Chapter IV - B Well Water System K - Process Radiation Instrumentation

~

Appendix - Valve Check Lists.

Drs. Biles and Carouthers indicated that, with these submissions, no further submittal of written material was essential to preparation of the examinations. They did, how-ever, request that we complete certain instrumentation installations prior to the date of examination, as follows:

1) Install at least one in-core ion chamber anplifier.
2) Complete the calibration marking on the turbine control selsyn dials.

We assured them that these two items would be completed prior to the date of examinat-ions. They proposed that this date continue to be nominally September 8, but that in fact, travel arrangements might delay the st, art of examinations until the morning of September 9.

We agre=d that this slight revision of schedule was agreeable. 800811'O 5 7/

s t

GEN ER AL h ELECTRIC Mr. E. R. Fleury August 28, 1959 At this writing, on August 28, we have placed in the nail to you three copies of the following material:

Volune 2 Steam Generation Chapter II Reactor Certain portions of this chapter were given to Drs. Biles and Carouthers during their visit.

It appears that we have been able to supply all the necessary written material, and have agreement on the date of examination. If you have need of additional infomation, please let us know as soon as possible.

Very truly yours, GENERAL ELECTRIC COMPANY b.4Lan -

.V. A. Hdaga Manager, Dresden Site Operations JAH:fw

.