ML19282C774
| ML19282C774 | |
| Person / Time | |
|---|---|
| Site: | 07100034 |
| Issue date: | 04/13/1979 |
| From: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| To: | Lowe J BABCOCK & WILCOX CO. |
| References | |
| NUDOCS 7905020198 | |
| Download: ML19282C774 (2) | |
Text
//flG P'bK, b
UNITED STATES y
o'1 NUCLEAR REGULATORY COMMISSION e
3" k d 21-WASHINGTON, D. C. 205E5 g$ ![d TGR 131979 a
,/
FCTR: RHO 71-0034 Babcock & Wilcox Construction Company ATTN:
Mr. J. R. Lowe 3333 Copley Road Copley, OH 44321 Gentlemen:
This refers to your application dated June 12, 1978 requesting approval of your Quality Assurance (QA) program as meeting the QA program requirements of 10 CFR 571.51.
In connection with our review, we need the information identified in the enclosure to this letter. Please submit seven copies of your re' ponse to the enclosed request for additional information within 30 days following receipt of this letter.
If you have any questions regarding this request, please contact Mr. Jack Spraul at (301) 492-7741.
Si ncerely, 47 vY Charles E. MacDonald, Chief
, Transportatior, Branch Division of Fuel Cycle and Material Safety, IPiSS
Enclosure:
Request for Additional Information 7905020% (97
s e
pfR 13 073 BABC0CK & WILCOX CONSTRUCTION COMPANY 971-0034)
Request for Additional Iafermation 1.
Provide statements that the final responsibility for the QA program rests with the B&W Construction Company, that the B&W Construction Company does not design or fabricate shipping packages for radioactive material, and that the RSO assures that all radioactive material shipping packages fabricated af ter effective date of this QA program are designed and manufactured under a QA program approved by the NRC.
2.
In Part 4, provide statements that shipments will not be made unless all tests, certifications, acceptances, and final inspections have been completed.
3.
In Part 7, provide statements to cover the following:
Audits of the QA Program will be performed using written check lists.
Results of audits will be maintained and reported to management. Audit reports will be evaluated and deficient areas corrected. The audits will be dependent on the safety significance of the activity being audited, but each activity will be audited at least once per year. Members of the audit team shall have no responsibility in the activity being audited.
Note that the activities of the Radiation Safety Officer should also be included in the audit program.
.