ML19282C142
| ML19282C142 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 03/02/1979 |
| From: | Wigginton D Office of Nuclear Reactor Regulation |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7903210062 | |
| Download: ML19282C142 (1) | |
Text
~
(
/
a i
1 MARCH 2
5 73 Docket No. 50-334
\\,
s_..
!'EMOPfJiDUM FOR:
A. Schwencer, Chief, Operating Reactors Branch #1, DDR FRON:
D. Wigginton, Project Manager, Operating Reactors Branch fl, 00R
SUBJECT:
FORTFCOING MEETING WITH DUOUESNE LIGHT CmpANY Ot! RAD 10LOGICAtr EFFL11ENT STAtiDARD:.TECHtTICAL: SPECIFICATION FOR BEAVER VALLEY POWER STATION, UNIT '!O.1 Date and Time:
March 13,1979 10:00 a.m.
Location:
Room P-130A Phillips Building
Purpose:
Discuss remaining items for innlemen-tation of.1tadtolt>gitaTJfflubnMtahdaVd Technic.
Specifications including following subjects:
- 1) Turbine Building Effluent Monitoring
- 2) Operability Requirements of Rod Vaste Equipment
- 3) Waste Gas System Oxygen Concentration Monitoring
Participants:
DLC J. Carcy, F. Bisscrt, L. Schad, J. Allingham, and J. Wenkhous NRC F. Cardile W. Burke, J. Collins, and F. Congel Original Signed By
\\
D. Wigginton. Project Manager
, n\\
Operating Reactors Branch fl 01 vision af Operating r;eactors DWiggintd6is A
,,,,,,,,,co: See next prae 02/*f79-
- T**
NRC FORM 318 (9-76) NROC 0240 W us s. eovammesawr entunne orrecs, teve - eas.ea4 7 903 21006 >