ML19282B958

From kanterella
Jump to navigation Jump to search
Forwards Interim Rept on Reportable Deficiency Re Improper Anchor Bolt Matl First Reported on 790208.Final Rept Will Be Submitted 790601
ML19282B958
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/08/1979
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19282B959 List:
References
ST-HL-AE-327, NUDOCS 7903190168
Download: ML19282B958 (1)


Text

"

Houston

~ (i} Lighting

& Power Company Electric Tower March 8, 1979 RQ Box 1700 ST-HL-AE-327 1 t l Houston.Teus 77001 SFN: 7-0100 Director, Region IV Office of Inspection S Enforcement Nuclear Regulatory Commission 611 Ryan Plaza Drive Arlington, Texas 76012

Dear Sir:

South Texas Project Units 1 S 2 Docket Nos. STN 50-498, STN 50-499 Interim Report on the Reportable Deficiency Concerninc Improper Anchor Bolt Material On February 8,1979, pursuant to 10 CFR 50.55(e), liouston Lighting S Power Company notified your office of a deficiency concerning the fabrication of anchor bolts from the improper material.

Attached is an interim report containing all available information.

A final report will be subnitted by June 1, 1979.

Very truly yours,

.4  %

E. A. Turner Vice President Power Plant Construction S Technical Services SSR/LRJ/bf Attachment cc: Messrs. D. G. Barker A. J. Granger C. Thrash (Baker S Botts)

R. Gordon Gooch (Baker S Botts)

J. R. Newman (Lowenstein, Newnan, Reis, Axelrad S Toll)

Wirector, Office of Inspection and Enforcement Nuclear Regulatory Commission Washington, D.C. 20555 k

\

790319 0 \b5 J

_. -- . - -