ML19282B816

From kanterella
Jump to navigation Jump to search
Forwards LER 79-003/03L-0
Date released: 10/23/2019 Download: ML19282B816


LER 79-003/03L-0 on 790214:during High Temp Isolation Calibr Procedure,Temp Switch TS 2-2373A Was Found to Trip in Excess of Tech Spec Limit.Caused by Setpoint Drift.Switch Recalibrated & Retested
ML19282B819
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 02/28/1979
From: Kopacz J
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19282B819 (2)
Forwards LER 79-003/03L-0
ML19282B815
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 02/28/1979
From: Kalivianakis N
COMMONWEALTH EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19282B815 (1)