IE Program Insp Rept 99900352/78-01 on 781129-1201.No Noncompliance Noted.Major Areas Inspected:Mgt Meeting,Design Tests & Field Svc Problems
ML19282B627
Person / Time
Issue date: 01/03/1979
From: Agee J, Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19282B626 List:
References
REF-QA-99900352 NUDOCS 7903160014
Download: ML19282B627 (6)


Text

.

g U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No.

99900352/78-01 Program tio.

51400 Company:

General Electric Company Power Systems Management Business Department 6901 Elmwood Avenue Pniladelphia, Pennsylvania 19142 Inspection Conducted: November 29-December 1, 1978 Inspector:

[/I dM

/[ /7/

Jy R. Agee? Contractor, ComponentsSection II Cate

' Vendor Inspection Branch Approved by:

//b/77 ped.M.Hunnicutt, Chief,ComponentsSectionII Date Vendor Inspection Branch Summary Inspection on November 27-December 1, 1978 (99900352/78-01)

Areas Insoected:

Implementa' tion of 10 CFR 50, Appendix B and QA Manual including: Management Meeting, Design Tests, Field Service Problems. The inspection involved eighteen (18) inspector-hours on site.

Results:

In the three (3) areas inspected no apparent deviations or unresolved items were identified in two (2) areas.

The following was identified in the remaining area.

Deviations : None.

Unresolved Items: Design Tests - qualifications testing of candidate Class IE relays has not been completed, although the test program is in progress.

Verification of adequacy and completeness of the program and compliance to regulatory requirements will be inspected ir, a subsequent inspection.

79031600N

. Details Section A.

Persons Contacted G. A. Buchanan - Manager, Manafacturing H. D. Culley - General Manager

  • L. L. Mankoff - Manager, Engineering
  • K. F. Miller - Manager, Strategic Planning and Development J. R. McHenry - Manager, Quality Assurance Puerto Rico Operations
  • L. Scharf - Manager, Production Engineering
  • J, F. Scamman - Production Engineer
  • C. A. Scott - Manager, Quality Systems, SSD
  • E. L. Stagliano - Fbnager, Product Planning
  • Denotes those present at the exit meeting.

B.

Management Meeting 1.

Objectives The objectives of this meeting were to:

a.

Meet the senior management of the Power Systems Management Business Department (PSMBD).

b.

Acquaint them with the NRC Vendor Inspection Program (VIP).

c.

Infcrm them of their responsibilities under Section 206 of Public Law 93-438.

d.

Obtain information concerning the establishment of PSMBD as a separate cost center at the Philadelphia site.

2.

Method of Accomolishment The preceding objectives were accomplished by:

a.

Meeting with the general manager and discussing details of the:

(1) NRC organizational structure (2)

Inspecticn activities of the VIP

. (3) Documentation requirements of the VIP including (a) How results of inspections are documented, distributed and filed in the Public Document Room.

(b) Explanation of " deviations" and " unresolved items."

(c) Explanation of the publication of the " White Book."

b.

Discussion of the separation of the Philadelphia facility into two (2) separate cost centers, namely, PSMBD and the Switchgear Business Department (SBD) for which Inspection Report 99900219/78-02 has been filed.

c.

Discussing the functional interface area between PSMBD and SBD such as auditing, receiving inspection, storage, and shipping.

d.

Discussing the PSMBD organizational structure which includes the Puerto Rico Operations where the largest volume of the Clast, IE relays are manufactured.

e.

Discussions wi n the Puerto Rico Operations QA Manager concerning the quality awarancc pqram operations and practices of the three (3) plants and receiving area at those locations.

3.

Comments Management acknowledged the inspector's statements and recogni-a.

tion of the 'SMBD commitments and responsibilities in the supply of safety-related products to the nuclear industry.

b.

Management explained the Puerto Rico Operations has an estab-lished qual 4 ty assurance program operating under the policy of the Qualtty Assurance Manual, Protective Relays and Components, Power Systems Management Business Department, dated Octob!r 20, 1978.

The Puerto Rico Operations has also implemented a separate QA Manual, with supplemental procedures, based on th3 criteria of 10 CFR 50, Appendix B.

C.

Desian Tests 1.

Objectives The objectives of this area of the inspection were to:

a.

Determine the status of the design and qualification test programs to quality relay products to applicable IEEE standards.

d

. b.

Verify that PSMBD has established a projected schedule of the qualification test programs, c.

Review documentation applicable to the design qualification test programs.

2.

Method of Accomplishment The preceding objective was accomplished by:

a.

Discussions with engineering design and management personnel concerning the; (1) Status of plans and schedules for full qualitication of relay products to Class IE applications.

(2)

Identity of models selected for qualification.

(3) Status of qualification tests conducted.

(4) Status of qualification test plans.

b.

Review of the document, 'GE. Test Summary, IEEE-323 Nuclear Qualification No. 60001, dated October 11, 1978," which describes the test technical spectrum to which the relay model will be qualification tested.

c.

Review of a list of the proposed relay models that will be subjected to the qualification tests.

d.

Review of the " Test Report No. F-C4851, Test of Gamma Radiation Endurance of Relays, January 1978, for GE SBD, PSM Department, Philadelphia, Pennsylvania", which summaries the results and data of the tests conducted.

e.

Review of the " Test Report No. 12485-26, October 6, 1976, Seismic Vibration Testing of Three (3) Relays for GE., P.O. No.

531-W-464830", which describes the seismic environment in which the relays were tested and summaries the resultant data.

f.

Review of the following GE documents:

(1) GEZ-6675 Relays and Accessories, Seismic Capabilties.

(2) GEZ-6678 Electromechanical Relays and Components, Position on IEEE 323-1974.

. g.

Review of draft copies of two (2) PSMBD Test Programs for Class IE qualification that are in preparation for final qualification of candidate relays for Class IE applications.

3.

Findings a.

Deviations None.

b.

Unresolved Item Certain PSMBD relay products for use in Class IE applications have not been fully qualification tested to meet applicable IEEE Standards. Qualification test programs are in progress and will be inspected for adequacy and completeness, during a future inspection.

D.

Field Service Problem 1.

Objectives The objective of this area of the report was to verify that the field service problem concerning relay loose wiring connections at a nuclear power facility, identified in Inspection Report No.

99900219/78-01, has been rectified.

2.

Method of Accomolishment The preceding objective was accomplished by; Review of GE Installation and Service Engineering Advice, a.

PSM (721) 161.1 entitled, "IAC Relays Loose Wiring Connections,"

dated May 5, 1978.

This document has been issued to all nuclear power facilities in which the arplicable type of relay had been installed.

b.

Discussions with cognizant personnel.

3.

Findings The inspector verified that corrective action had been implemented to preclude recurrence of this non-generic problem of loose wiring connections to relay screw-type terminals to time over-current relays.

. E.

Exit Interview The inspector met with management representatives (indicated by asterisk in paragraph A) at the conclusion of the inspection on December 1,1978.

The inspector summarized the scope of the inspection in the following areas and/or functions:

1.

Management meeting 2.

Design tests 3.

Field service problem *.

An unresolved item was identified relative to design and qualification test programs. The management representatives acknowledged the inspec-tion items discussed by the inspector.

-