Annual Rept Re Personnel & man-rem Exposure by Job Function
ML19282A759
Person / Time
Site: Pilgrim, 05000471, 05000472
Issue date: 02/28/1979
From: Mcguire P
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
79-51, NUDOCS 7903060452
Download: ML19282A759 (3)


Text

I k

so"" Edtson -~"

PILGniM NUCLEAR PowEn ST ATION Rf D # 1 ROCKY f 8 LL HOAl>

1 PLYMOUTH. MAssACHustTis 07360 February 28, 1979 BECo Ltr #79-51 U. S. Nuclear Regulatory Commission Office of Inspect 1un and Enforcement 631 Park Avenue King of I-ssia, PA 19406

Dear Sir:

In accordance with the reporting requirement of USNRC Regulatory Guide 1.16, Pilgrim Nuclear Power Station is forwarding the attached Annual Report regarding personnel and man-rem exposure by job function.

Small cxposures, totalling less than 20 percent of the total dose, have not been accounted for.

S*.ncerely, P. J. McG ire Station Manager I

ART:ep l

i Attachment cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 l

7903060451 o

NUMBER OF PERSONNEL AND MAN-REM EXPOSURE BY WORK AND JOB FUNCTION Number of Personnel ( 3 100 mrem)

Total Man-Rem WORK AND JOB FUNCTION Station l Utility Contract Workers Station Utility Contract Worker Employees Employees and Others Employees Employees and Others REACTOR OPERATIONS & SURVEILLANCE thintenance Personnel 54 0

109 26.425 0

25.255 Opera ting Personnel 22 0

0 49.186 0

0 Health Physics Personnel 16 0

27 13.895 0

9.208 Supervisory Personnel 14 0

2 7.314 0

0.075 Engineering Personnel 4

0 1

. J '-

0 0

ROUTINE MAINTENANCE Maintenance Personnel 56 14 380 99.594 46.566 339.214 Operating Personnel 26 0

0 7.271 0.015 0

Health Physics Personnel 17 0

60 11.136 0

58.584 Supervisory Personnel 12 5

6 8.927 0.440 3.200 Engineering Personnel 8

0 38 1.115 0

28.455 INSERVICE INSPECTIOt' thintenance Personnel 20 0

27 1.080 0

1.665 Operating Personnel 9

0 0

0.465 0

0 Health Physics Personnel 10 0

4 0.245 0

0.150 Supervisory Personnel 2

0 0

0.270 0

0 Engineering Personnel 3

0 0

0.115 0

0 SPECIAL MAINTENANCE

>Sintenance Personnel 48 27 140 44.580 2.850 246.654 Opera ting Personnel 26 0

0 6.325 0

0 Heal th Physics Personnel 12 0

51 4.940 0

8.162 Supervisory Personnel 16 3

8 6.513 1.1 30 0.630 Engineering Personnel 5

2 2

3.175 0.090 0.010 WASTE PROCESSING Maintenance Personnel 28 11 89 14.296 1.750 44.828 Operating Personnel 26 0

0 4.760 0

0 Health Physics Personnel 10 0

37 3.414 0

1.023 Engineering Personnel 8

5 12 0.170 0.085 2.705 Paga 1 of 2

a

!!lDfBER OF PERSO:!NEL A!!D MMi-REM EXPOSURE BY WORK AND JOB FUNCTION Number of Personnel (

100 mrem)

Total Man-Rea

!.'ORK A' D JOB FUNCTIO:

S ta tion Utility Contract Workers Station Utility Contract Workers Employees Employees and Others Employees Employees cnd Ot'aers REFUELING 3bintenance Personnel Operating Personnel Health Physics Personnel N/A N/A N/A N/A N/A N/A Supervisory Personnel Engineering Personnel TOTAL

>Sintenance Personnel 57 53 521 185.975 51.166 657.616 Operating Personnel 30 1

0 68.027 0.015 0

Health Physics Personnel 17 0

65 33.630 0

77.127 Supervisory Personnel 21

.6 12 23.449 1.590 4.040 Engineering Personnel 14 22 44 8.529 0.175 31.170 GRAND TOTAL 139 82 642 319.610 52.946 769.953 Pate 2 of 2