ML19282A759
| ML19282A759 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim, 05000471, 05000472 |
| Issue date: | 02/28/1979 |
| From: | Mcguire P BOSTON EDISON CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 79-51, NUDOCS 7903060452 | |
| Download: ML19282A759 (3) | |
Text
I k
so"" Edtson -~"
PILGniM NUCLEAR PowEn ST ATION Rf D # 1 ROCKY f 8 LL HOAl>
1 PLYMOUTH. MAssACHustTis 07360 February 28, 1979 BECo Ltr #79-51 U. S. Nuclear Regulatory Commission Office of Inspect 1un and Enforcement 631 Park Avenue King of I-ssia, PA 19406
Dear Sir:
In accordance with the reporting requirement of USNRC Regulatory Guide 1.16, Pilgrim Nuclear Power Station is forwarding the attached Annual Report regarding personnel and man-rem exposure by job function.
Small cxposures, totalling less than 20 percent of the total dose, have not been accounted for.
S*.ncerely, P. J. McG ire Station Manager I
ART:ep l
i Attachment cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.
20555 l
7903060451 o
NUMBER OF PERSONNEL AND MAN-REM EXPOSURE BY WORK AND JOB FUNCTION Number of Personnel ( 3 100 mrem)
Total Man-Rem WORK AND JOB FUNCTION Station l Utility Contract Workers Station Utility Contract Worker Employees Employees and Others Employees Employees and Others REACTOR OPERATIONS & SURVEILLANCE thintenance Personnel 54 0
109 26.425 0
25.255 Opera ting Personnel 22 0
0 49.186 0
0 Health Physics Personnel 16 0
27 13.895 0
9.208 Supervisory Personnel 14 0
2 7.314 0
0.075 Engineering Personnel 4
0 1
- . J '-
0 0
ROUTINE MAINTENANCE Maintenance Personnel 56 14 380 99.594 46.566 339.214 Operating Personnel 26 0
0 7.271 0.015 0
Health Physics Personnel 17 0
60 11.136 0
58.584 Supervisory Personnel 12 5
6 8.927 0.440 3.200 Engineering Personnel 8
0 38 1.115 0
28.455 INSERVICE INSPECTIOt' thintenance Personnel 20 0
27 1.080 0
1.665 Operating Personnel 9
0 0
0.465 0
0 Health Physics Personnel 10 0
4 0.245 0
0.150 Supervisory Personnel 2
0 0
0.270 0
0 Engineering Personnel 3
0 0
0.115 0
0 SPECIAL MAINTENANCE
>Sintenance Personnel 48 27 140 44.580 2.850 246.654 Opera ting Personnel 26 0
0 6.325 0
0 Heal th Physics Personnel 12 0
51 4.940 0
8.162 Supervisory Personnel 16 3
8 6.513 1.1 30 0.630 Engineering Personnel 5
2 2
3.175 0.090 0.010 WASTE PROCESSING Maintenance Personnel 28 11 89 14.296 1.750 44.828 Operating Personnel 26 0
0 4.760 0
0 Health Physics Personnel 10 0
37 3.414 0
1.023 Engineering Personnel 8
5 12 0.170 0.085 2.705 Paga 1 of 2
a
!!lDfBER OF PERSO:!NEL A!!D MMi-REM EXPOSURE BY WORK AND JOB FUNCTION Number of Personnel (
100 mrem)
Total Man-Rea
!.'ORK A' D JOB FUNCTIO:
S ta tion Utility Contract Workers Station Utility Contract Workers Employees Employees and Others Employees Employees cnd Ot'aers REFUELING 3bintenance Personnel Operating Personnel Health Physics Personnel N/A N/A N/A N/A N/A N/A Supervisory Personnel Engineering Personnel TOTAL
>Sintenance Personnel 57 53 521 185.975 51.166 657.616 Operating Personnel 30 1
0 68.027 0.015 0
Health Physics Personnel 17 0
65 33.630 0
77.127 Supervisory Personnel 21
.6 12 23.449 1.590 4.040 Engineering Personnel 14 22 44 8.529 0.175 31.170 GRAND TOTAL 139 82 642 319.610 52.946 769.953 Pate 2 of 2