ML19282A032

From kanterella
Jump to navigation Jump to search
Forwards Final Status Rept EF2-46,047 of 790419 Deficiency Rept on Torus Ring Beam Weld Indications.
ML19282A032
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/01/1979
From: Fahrner W
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19282A033 List:
References
EF2-46-133, NUDOCS 7905090351
Download: ML19282A032 (2)


Text

e Detroit 20C0 Se Ec ison mm=ccnd AveNe May 1, 1979 EF2-46,133 Mr. James G. Keppler Regional Direc*or Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Subject:

10 CFR 50.55(e) Deficiency Report On Torus Ring Beam Weld Indications

References:

1) 10 CFR 50.55(e) Deficiency Report Telephone Call of October 3, 1978, to NRC Region III (EF2-44,323 of October 5, 1978)
2) Interim Status Report EF2-44,333 of November 3, 1978
3) Interim Status Report EF2-45,006 of December 1, 1978
4) Interim Status Report EF2-45,024 of January 3, 1979
5) Interim Status Report EF2-44,020 of February 15, 1979
6) Final Status Report EF2-46,047 of April 19,1979 (attachment)

Pursuant to the provisions of 10 CFR 50.55(e), item (3), attached please find our final status report EF2-46,047 of April 19, 1979.

Sincerely yours,

) W.

S t . b 4 0 ^ ~--

. Fahrner Project Manager Enrico Fermi 2 RWB/pm Attachment ec: Mr. John G. Davis, Acting Director \%

Office of Inspection and Enforcement Division of Reactor Inspection Programs )

U.S. Nuclear Regulatory Commission I Washington, D.C. 20555 790500035y

Detroit Edison - - - -

_e ENRICO FERMI UNIT 2 PROJECT ~

ENGIbTERING RECEIVED APR T71979 April 19, 1979 R. W. D ARR EF2-46,047 To: R.W. Barr Project Quality Assurance Director From: M.G. Sigetich M Supervising Engineer - EG44

References:

(1) Memorandum EF2-42,243, " Report to NRC on Torus Ring Beam Weld Indications."

(2) Memorandum EF2-42,405," Progress Report No. 2, to the NRC on Torus Ring Beam Weld Indications."

(3) Memorandum EF2-43,685, " Progress Report No. 3, to the NRC on the Torus Ring Beam Weld Indications."

(4) Memorandums EF2-44,020, " Progress Report No. 4, to the NRC on the Torus Ring Beam Weld Indications."

Subject:

Deficiency Report to the NRC on the Torus Ring Beam Weld Indications Attached, please find Engineering's Deficiency Report, of the torus ring beam weld indications for your transmittal to the h1C.

Approved by: 2 ~jI M-[7; W.F. Colbert Written by: d.

lSP A.K. Lim , f 4 ec: T.A. Alessi 4

  1. J.H. Casiglia W.M. Street A. Alexiou W.J. Fahrner C.R. Bacon J.D. Ryan/A Walker E.G. Shifrin E. Lusis J. Bodzin L.E. Schuerman Doc. Control F.E. Gregor A. Higginbotham (Nutech)

.