ML19281B295
| ML19281B295 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 04/23/1979 |
| From: | Mcgaughy J MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| AECM-79-38, NUDOCS 7905040636 | |
| Download: ML19281B295 (2) | |
Text
o i
@[
MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 16 4 0, J A C K S O N, MIS SIS SI P PI 3 9 2 0 5 e n c o u c tio n o c "* *'"'"'
April 23, 1979 U. S. Nuclear Regulatory Co= mission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 ATTENTION:
Mr. J. P. O'Reilly, Director Gentlemen:
SUBJECT:
Grand Gulf Nuclear Station File 0270/0494/15521 Units 1 and 2 RII: PKV 50-416,417/79-02 IE Inspection Report of February 12-15, 1979 AECM-79/38 In response to your letter dated March 22, 1979 which contained IE Inspection Report 79/02, the following is submitted:
(1) Corrective Siens Taken and Results Achieved A Bechtel Quality Action Request (QAR) was issued February 19, 1979, on tha welding electrodes found in the drywell area. This QAR was closed 3/13/79.
The electrodes were properly disposed of upon being returned to the Rod Issue Area.
An investigation revealed that this was an isolat.d case, caused by an oversight of personnel.
(2) Corrective Steps Taken to Avoid Further Noncompliance The Project Superintendent issued an interoffice memorandum to the Project Field Contracts Administrator and the Field Superintendents for Unit 1 and Unit II emphasizing responsi-bility for rod control and that violation of the requirements may be cause for disciplinary action.
(3) Date to Achieve Full Compliance Full complianca was achieved on March 8,1979.
We find no proprietary data contained in the inspection report.
QQ v9 M oSo % 3G t
Member Middle South Utilities System
m 4
MISSISSIPPI POWER & LIGHT COMPANY U. S. Nuclear Regulatory Commission AECM-79/38 April 23, 1979 Yours truly, J. P. McGaughy, Jr.
Director of Power Production JRF:pa cc:
Mr. N. L. Stampley Mr. R. B. McGehee Mr. T. B. Conner Dr. Ernst Volgenau, Director 4 THIS 00P1',W Division of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 O
e