ML19281B202

From kanterella
Jump to navigation Jump to search
Agenda of ACRS 781005 Meeting to Discuss Fftf Project
ML19281B202
Person / Time
Issue date: 10/05/1978
From:
Advisory Committee on Reactor Safeguards
To:
Advisory Committee on Reactor Safeguards
References
ACRS-MS-562A, NUDOCS 7905020162
Download: ML19281B202 (1)


Text

A]S-0562h fDA zbr/M ACRS REVIEW 0F FFTF PROJZCT OCTOBER 5,1978 LENGTH TIME I.

PRESENTATIONS BY FFTF PROJECT A.

Containment Margins 45 mins.

1.

Background and Description 2.

Experimental Results 3.

Analytical Results B.

Electrical and Reactor Shutdown System Reliability 30 mins.

C.

Summary of Project Positions on Piping Containment Margins 15 mins.

BREAK 15 mins.

II. RESPONSE TO QUESTIONS FRnM SEPTEMBER 7,1978 ACRS Meeting A.

Project Studies of a Sand ar.d Gravel Filter System - FFTF 15 mir.s.

L Fire Protection Plans - FFTF 15 mins.

(Na and Convent'onal Fires)

C.

Control of Tritium - FFTF 10 mins.

D.

Containment Isclation - FFTF 10 mins.

(Use of a Smoke Detector)

E.

Validity of Ca' culations Stewing Doses Near 101.FR Part 100 f imits With a Vented Containment - MRC 20 mins.

F.

Loss of Heat Sink for the Co. e - NRC 20 mins.

1.

Mechanism for Loss of Heat Sink 2.

Duration of Core Cooling With Loss of Heat Sink III.

SUMMARY

OF NRC POSITIONS 15 mins.

7 90502 01G