ML19281A908

From kanterella
Jump to navigation Jump to search
Accepts XN-NF-1, QA Program Topical Rept for Nuclear Fuel Design & Fabrication. Concludes Program Should Be Implemented Immediately
ML19281A908
Person / Time
Issue date: 03/21/1979
From: Haass W
Office of Nuclear Reactor Regulation
To: Jamila Perry
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML19281A909 List:
References
NUDOCS 7904160148
Download: ML19281A908 (2)


Text

PDk r

!!AR 21 1979

!!r. J. A. Perry, Manager Quality Assurance Exxon Nuclear Company, Inc.

2955 George Washington llay Richland,liashington 99352

Dear fir. Perry:

SUBJECT:

NRC ACCEPTAliCE OF EXXON flUCLEAR COMPANY QA TO

!!e have evaluated Exxon's Topical Report tio. XN-NF-1, " Quality Assurance Program Topical Report for fluclear Fuel Design and Fabrication" and Revisicas 1, 2, 2A, and 2B submitted with your !! arch 24, 1978, 19.78, November 2,1978, and March 1,1979 letters, respectively. August 11, is our understanding that the changes identified in these revisions It will be incorporated into XN-NF-1, and the topical report will be renumbe' red and formally issued as XN-NF-1A, Revision 2.

Based on our review and evaluation of the topical report through Revision Part 50 are included in the QA program requirements.28, w topical report is acceptable, and you may inplement it upon issuanceTherefore, of the report.

report when it is referenced in an application.We do not intend to rep To use the Exxon topical report in future license applications, applicants need only reference this_ topical report in Chapter 17 of the Safety' Analys Report.

In addition, this QA program nay be implemented imediately on all ongoing activities within the contractual restraints of existing contracts for nuclear power plants.

letter those existing contracts that will be covered by Revision 2 XN-NF-1A.

about this topical report are invalidated, we will notify be given the opportunity to revise and resubmit it should you so desire You will Prograrmiatic changes by Exxon to this topical report are to be submitted to flRC for revieu prior to implementation.

be submitted no later than 30 days after announcement. Organizational changes ar 790416D/%f CFPICE F BUR 8d A htt b DATKb NEC IO2r4 318 (9-76) NRCt 0243 W v.s. seve==usar annarme onesce: e en - as s - ees

lir. J. A. Perry,

Please include a copy of this letter and the enclosed topical report evaluation in your report, renumber the report Xil-ItF-1A, Revision 2, and resubmit 38 copies to the !tRC.

Should you have any questions regarding our review or if we can provide assistance, please feel free to contact ifr. Jmes Conway on (301) 492-7741.

Sincerely.

Originalsi;;nad by

%' alter P. Haass Salter P. Ilaass, Chief Quality Assurance Branch Division of Project l'anagement

Enclosure:

Topical Report Evaluation DISTRIBUTION:

Central File QAB Projects QAB Chron. File NpRReading File W RC PDR DJSkovholt, DPM WReinmuth, IE JConway, QAB JGilray, QAB orr'c = *

.DPII:QAB..

kI..S k

.. )P/;;ky JComva,y,:,g,t..

_,,qGil s'y..

.. Pb.

aa summaus p 3C.a9

!sLda9

. 3/2//79...

ICCTCRM 318 (9 74) NRCM C243 D u.s. e ovs ==== =v caiavi=a ca rec e : e e n s - r e s - s e e

.