ML19281A551

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Feb 1979
ML19281A551
Person / Time
Site: Farley 
Issue date: 03/14/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19281A552 List:
References
NUDOCS 7903210144
Download: ML19281A551 (1)


Text

}

A.a m Pw < O o r. : <

ru m e m u...

Il,' (/', f d l).a 6.i I Br A d

'!1 f

's ! ' s 3!1

.[8 e

m F. L. CL AYTON, JR.

Mghgmg %g'g[

.. n a.

  • March 14, 1979 Director, Office of Management Information and Program Control U. S. Nuc1 car Regulatory Commission Washington, D.C.

20555 Re: Joseph M. Farley Nuclear Plant Unit No. 1 Docket No. 50-348 Monthly Operating Data Report

Dear Sir:

Attached are two (2) copies of the February, 1979 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications.

As requested by letter f rom Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, F. L. Clayt 1,

Jr.

FLCJ r/THC:bhj Attachment cc: Director, IE (10 copies)

Director, RII (1 copy) 3 903 lo#b o

k\\

R