ML19281A350
| ML19281A350 | |
| Person / Time | |
|---|---|
| Site: | 05000560 |
| Issue date: | 02/16/1979 |
| From: | Snell J Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 7903120136 | |
| Download: ML19281A350 (1) | |
Text
//P c P T,J }{
b c
UNITED STATES
[V f
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FEB 161979 DOCKET NO.:
STN-50-560 FACILITY:
B0PSSAR APPLICANT:
Fluor Power Services, Incorporated
SUBJECT:
SUMMARY
OF JANUARY 26, 1979 ACRS SUBCOMMITTEE AND FEBRUARY 9, FULL ACRS NTETINGS On January 26, 1979, the B0PSSAR subcommittee met with the staff and applicant to discuss the B0PSSAR/BSAR-205 application. And on February 9,1979, the full Committee met and discussed the standard application. A copy of the transcript of these meetings is available in the NRC Public Document Room.
30th meetings were relatively short since this was the second submittal for B0PSSAR, this time usin; the B&W reference NSSS.
The staff discussed the scope of review in that it only reviewed changes from the previous submittal necessitated by interfacing with the B&W BSAR-205.
Fluor made presentations on (1) organization, (2) incorporation of operating experience, (3) physical separation, (4) decontamination and decommissioning, and (5) systems interaction studies.
The full Committee indicated they would write a favorable letter to the Commission.
h 1'(l9 b-James Snell, Project Manager
, Standardization Branch LDivision of Project Management cc:
W. Larkin, Vice President Engineering and Construction Fluor Power Services, Inc.
200 West Monroe Street Chicago, Illinois 60606 7903120134