ML19281A122

From kanterella
Jump to navigation Jump to search
Ack Receipt of 790126 Interim Deficiency Rept Re Heater Wiring Control Room Air Filtering Units
ML19281A122
Person / Time
Site: Midland
Issue date: 02/08/1979
From: Heisman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 7903060583
Download: ML19281A122 (1)


Text

r-h pe at og4 UNITED STATES p

g

[g

.t NUCLEAR HEGULATORY COMMISSION f,, /. ;.

REClON til

  1. f 799 ROOSE V E L ? HU AD 4

/

G '. E N E L L Y N, I L L a r. J o, 60137 FEB 8

.i9 Docket No. 50-329 Docket No. 50-330 Consumers Power Company ATTN: -Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, M1 49201 Centlemen:

Thank you for your interim report dated January 26, 1979, pursuant to 10 CFR 50.55(e) regarding heater wiring of control room air filtering units. We will eview your final report on this matter upon receipt.

Your cooperation with us is appreciated.

Sincerely, F. Heishman, Chief Reactor Construction and Engineering Support Branch cc:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Dr. Wayne E. North Myron d. Cherry, Chicago 790306058'3 J