MONTHYEARML24306A1422024-11-0101 November 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Adopt Alternative Seismic Method for 50.69 Categorization of SSCs ML24262A2232024-09-18018 September 2024 Part Event Notification 57330. Part 21 - Control Relay Defect ML24256A1402024-09-0505 September 2024 Preliminary Data Needs and Agenda to Support the Supplemental Environmental Audit for Point Beach, Units 1 and 2 - File Copy ML24226A6842024-08-13013 August 2024 NRR E-mail Capture - Point Beach, Units 1 and 2 - Acceptance of License Amendment Request to Adopt TSTF-577 ML24215A2092024-08-0101 August 2024 NRR E-mail Capture - Final RAI - Point Beach 1 & 2 - License Amendment Request to Modify Containment Average Air Temperature Requirements ML24199A2142024-07-17017 July 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Modify Containment Average Air Temperature Requirements ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24108A1022024-04-17017 April 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Revision to Reactor Vessel Surveillance ML24053A0112024-02-21021 February 2024 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Request CISI-03-01 for Containment Unbonded Post-Tensioning System Inservice Inspection Requirements 3 ML23271A1542023-09-28028 September 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23208A3072023-07-27027 July 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23136A2782023-05-0505 May 2023 Email to R Coffey Point Beach SLRA Second Annual Update - Request for Additional Information Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22291A3692022-10-18018 October 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Use Beacon Power Distribution Monitoring System ML22249A0052022-09-0202 September 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment and Exemptions Regarding Risk-Informed Approach to Address GSI-191 ML22229A1052022-08-17017 August 2022 Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment ML22229A1022022-07-18018 July 2022 Original Request - Questions Regarding Point Beach Nuclear Power Plant ML22196A0062022-07-15015 July 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4b ML22094A0802022-04-0404 April 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-366 ML22006A2762022-01-0606 January 2022 SLR - FW: Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML22006A2012022-01-0606 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22006A1952022-01-0606 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments Nrc’S Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A3202022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments Nrc’S Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A0012022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A3212022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A1732022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments Nrc’S Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A1942022-01-0404 January 2022 SLR - (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments Nrc’S Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, Docke ML22004A3192022-01-0404 January 2022 SLR - FW: Point Beach ML22004A3182022-01-0404 January 2022 SLR - FW: EPA Comment Letter - Point Beach SEIS ML22004A1672022-01-0404 January 2022 SLR - Ref: Point Beach ML22006A1992022-01-0303 January 2022 SLR - (External_Sender) Comments of Michael J Keegan on Dseis Point Beach ML22004A3172021-12-21021 December 2021 SLR - (External_Sender) EPA Comment Letter - Point Beach SEIS ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML22006A2752021-12-0202 December 2021 SLR - (External_Sender) Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML21341A6102021-11-16016 November 2021 SLRA Safety RAI Set 12 Final Email ML21314A4212021-11-10010 November 2021 Fws to NRC, Concurrence with ESA Determination for Point Beach Subsequent License Renewal ML21307A1522021-11-0909 November 2021 NRC to Fws, Request for Concurrence with Endangered Species Act Determinations for Point Beach Subsequent License Renewal ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21279A1202021-10-0505 October 2021 Email: Wi SHPO Review Point Beach Nuclear Plant SLR ML21273A0232021-09-0202 September 2021 SLRA Safety RAI Set 9 Final Email ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2462021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final Email 2024-09-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24215A2092024-08-0101 August 2024 NRR E-mail Capture - Final RAI - Point Beach 1 & 2 - License Amendment Request to Modify Containment Average Air Temperature Requirements ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24176A2242024-06-24024 June 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24149A1922024-05-28028 May 2024 Notification of NRC Baseline Inspection and Request for Information ML24141A1382024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection.Docx ML24030A0352024-01-30030 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23163A2422023-06-13013 June 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000266/2023004 ML23136A2802023-05-0505 May 2023 SLRA Second Annual Update RAI Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML23003A8022023-01-0303 January 2023 Notification of NRC Baseline Inspection and Request for Information ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22266A0872022-09-23023 September 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML22172A1192022-06-27027 June 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-505 Provide Risk Informed Extended Complete Times - RITSTF Initiative 4B ML22130A5712022-05-12012 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22041B0752022-02-10010 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000266/2022002 ML21362A6812021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6702021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21286A6042021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21273A0222021-09-29029 September 2021 SLRA Safety RAI Set 9 Final ML21287A0862021-09-29029 September 2021 SLRA Safety RAI Set 11 Final ML21253A1672021-09-10010 September 2021 Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information Inspection Report 05000266/2022010 05000301/2022010 ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2472021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 ML21242A2232021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 Email ML21242A2192021-08-20020 August 2021 SLRA Safety RAI Set 7 Final Email ML21242A2202021-08-20020 August 2021 SLRA Safety RAI Set 7 Final ML21242A2142021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft ML21242A2132021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft Email ML21242A0152021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final ML21242A2392021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final ML21242A2032021-08-12012 August 2021 Srla Safety RAIs Set 5 Final ML21242A2382021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A2042021-08-12012 August 2021 SLRA Safety RAIs Set 5 Final Email ML21242A0122021-08-0909 August 2021 SLRA Draft Safety RAIs Set 6 ML21285A1212021-08-0505 August 2021 SLRA Public Meeting Discussion Questions August 5 2021 ML21242A2002021-08-0505 August 2021 SLRA Draft Safety RAIs Set 5 Email ML21242A1992021-08-0505 August 2021 Srla Draft Safety RAIs Set 5 ML21238A2322021-08-0404 August 2021 SLRA Safety RAI Set 4 Final Email ML21238A2332021-08-0404 August 2021 SLRA Safety RAI Set 4 Final ML21237A0062021-08-0202 August 2021 SLRA Draft Safety RAIs Set 4 ML21208A1892021-07-27027 July 2021 SLRA Safety RAIs Set 2 Final 2024-08-01
[Table view] |
Text
NRR-DRMAPEm Resource From: Chawla, Mahesh Sent: Thursday, October 3, 2019 4:52 PM To: Schultz, Eric Cc: Catron, Steve (Steve.Catron@fpl.com); Mack, Jarrett; Schneider, Thomas; Hartman, Thomas; Barclay, Kevin; Duncan, Eric; Sheng, Simon; Alley, David; Skokowski, Richard
Subject:
FINAL- Request for Additional Information - Relief Request 1-RR-13 and 2-RR-13, Proposed Alternative in Accordance with10 CFR 50.55a(z)(1), Extension of Inspection Interval for PBNP Units 1&2 RPV Welds from 10 to 20 Years - EPID L-2019-LLR-0060
Dear Mr. Schultz,
By letter dated June 19, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19170A285), NextEra Energy Point Beach, LLC (the licensee) requested an alternative to the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Table IWB-2500-1 for Category B-A and B-D examinations for Point Beach Nuclear Plant (Point Beach), Units 1 and 2 reactor pressure vessel (RPV) welds and nozzle welds.
Specifically, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), the licensee requested to use the proposed alternative to extend the fifth inservice inspection (ISI) interval at Point Beach, Units 1 and 2 for Category B-A and B-D examinations so that the fifth ASME Code required examination can be performed in 2029 for both units on the basis that the alternative provides an acceptable level of quality and safety. The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the submittal and needs the following additional information to complete the review.
RAI-1
Table 3 in Title 10 of Code of Federal Regulations Part 50.61a, Alternative fracture toughness requirements for protection against pressurized thermal shock events lists maximum number of flaws depthwise for plates and forgings of a generic RPV. However, Table 2 of Alternative Request 1-RR-13 shows different maximum number of plate flaws for the Point Beach, Unit 1 RPV beltline, considering the plant-specific RPV geometry.
Please explain how 3628 in2 of inside surface area was calculated to support the differences between the values in Table 3 of 50.61a and Table 2 of 1-RR-13.
The draft version of the RAI was sent to you on October 01, 2019 to ensure that the request is understandable and the regulatory basis for the request is clear. The follow up clarification call was held today (October 3, 2019) with your representatives. As per the discussion on the teleconference this afternoon, the staff has revised the subject RAI. Your representative, Jarrett Mack has agreed to provide your response on the docket within 30 days of the receipt of this email. This email does not convey or represent an NRC staff position regarding NextEras request. Thanking you, Sincerely, Mahesh Chawla Division of Operating Reactor Licensing Licensing Branch LPL-3 1
Hearing Identifier: NRR_DRMA Email Number: 241 Mail Envelope Properties (MWHPR09MB150385F608842F83F32E06DBF19F0)
Subject:
FINAL- Request for Additional Information - Relief Request 1-RR-13 and 2-RR-13, Proposed Alternative in Accordance with10 CFR 50.55a(z)(1), Extension of Inspection Interval for PBNP Units 1&2 RPV Welds from 10 to 20 Years - EPID L-2019-LLR-0060 Sent Date: 10/3/2019 4:51:52 PM Received Date: 10/3/2019 4:51:00 PM From: Chawla, Mahesh Created By: Mahesh.Chawla@nrc.gov Recipients:
"Catron, Steve (Steve.Catron@fpl.com)" <Steve.Catron@fpl.com>
Tracking Status: None "Mack, Jarrett" <Jarrett.Mack@fpl.com>
Tracking Status: None "Schneider, Thomas" <Thomas.Schneider@nexteraenergy.com>
Tracking Status: None "Hartman, Thomas" <Thomas.Hartman@nrc.gov>
Tracking Status: None "Barclay, Kevin" <Kevin.Barclay@nrc.gov>
Tracking Status: None "Duncan, Eric" <Eric.Duncan@nrc.gov>
Tracking Status: None "Sheng, Simon" <Simon.Sheng@nrc.gov>
Tracking Status: None "Alley, David" <David.Alley@nrc.gov>
Tracking Status: None "Skokowski, Richard" <Richard.Skokowski@nrc.gov>
Tracking Status: None "Schultz, Eric" <Eric.Schultz@nexteraenergy.com>
Tracking Status: None Post Office: MWHPR09MB1503.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2391 10/3/2019 4:51:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: