, s DEC 2 41350 MEMnRANDISt FOR: Karl R. Goller. Director Division of Siting, Heal th, and Safeguards Standards Office of Standards Developnent FROM:
Tres E. Hurley, Director Division of Safety Technology Office of Nuclear Reactor Regulation
SUBJECT:
REVIEW OF PROPOSED REGULATDRY. GUIDE 1.145, " ATMOSPHERIC DISPERSION MODELS FOR POTENTIAL ACCIDENT CONSEQUENCE ASSESSMENTS AT NUCLEAR POWER PLANTS." REVISIOM 1 In response to your memorandum dated Novmber 4,1980, we have reviewed the subject document. Our detailed coments are included in the enclosed marked-up copy of the guide. The majority of the coments were made for increased clarity and accuracy. Hcwever, we still do not agree that the reference +4 emergency plans should be included. We emphasize that the procedures described in this guide may not be appmpriate for mergency planning on a generic basis.
No procedures or techniques involving use of this guide for emergency plans have been developed or are under consideration. Reference to emergency plans in this guide may imply that these models and procedures are app 11 cable to emergency plans. These models are not necessarily in compliance with the guidance in Appendix 2 of NUREG-0654, ' Criteria for Preparation and Evaluation of Radiological tsergency Response Plans and Preparedaess in Support of Nuclear Power Plants."
Before this guide is issued, the supporting Nr, REG discussed in your memorandum to D. Ross, dated Ap;ust 8,1980, should be prepared. As you pointed out in that memorandum, a comitment to have the R" REG available, before the. guide is issued, was made by NRR to the ACRS at 'ts January 5,1979 meeting. I understand that your staff is attempting *m have this MUREG prepared by a local consul tant.
Any questions should be duected to Earl !!.11artee. Accident Evaluation Ersnch.
Orif calf!ced 5y '
f M M**-
EPDB EP: IE SRamos BGrimes*
omas E. Murley, Director
?) O 12/24/S0*
12/24/30 Division of Safety Technology j
Office of Nuclear Reactor Regulation yi Distribution Copies:
RKornasiewic:
Central File PM TSchultze DST 30-151 FSchroeder hiianton EMarkee SRamo v llin TM e v DCeta WK-ecer BGri es e u m
we u
sy,7 l g, Note: See crevious yellow lfor acd'l concurre'nces.*
are.ec, ggsc
.:.a
-usa
- e v urg m cgee.
~
m, [PCota :JG/ J A l
RSC5 i CSI:AEB
! RP:DSI y,p n l 3
me F ~~~
1:/ 5/>0 12/165:
f2/19/ 20
'i i
1 12/12/E0 l
cer-
~
? CM MO40
- w*
- D*'**"*8"'
=,
A DISTRIBUTIONS NRR READING FILE SUBJECT FILE CENTRAL FILE TERA PDR TSCHULTZE DST 8C-15'i JMULLIN FSCHR0EDER Karl R. Goller, Director MEMORANDUM FOR:
Division of Siting, Health, and Safeguards Stab 5b5 Office of Standards Development GWKNIGHTON FROM:
Thomas E. Murley. Director KEE Division of Safety Technology WKREGER Office of Nuclear Reactor P.egulation SRAMOS B
SUBJECT:
REVIEW OF PROPOSED REGULATORY GUIDE 1.145 R :
IEWICZ
" ATMOSPHERIC DISPERSION MODELS FOR POTENTIAL SRAM05 ACCIDENT CONSEQUENCE ASSESMENTS AT NUCLEAR POWER P1 ANTS," REVISION 1 h s In response to your memorandum dated Nover.ber 4,1980, we have reviewed the subject document. Our detailed cocrents are included in the enclosed marked-up copy of the guide. The majority of the coments were made for increased clarity and accuracy. However, we stili do not agree that the reference te energency plans should be included. We emphasize that the procedures described in this guide may not be appropriate for emergency planning en a generic basis.
No procedures or techniques involving use of this guide for energency plans have been developed or a.ae under eensiderr. tion. Reference to emergency plans in this guide may imply that these rodels and procedures are applicable to coergency plans. These models are not necessarily in compliance with the guidance in Appendix 2 of NURES-0654, " Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
Before this guide is issued, tne supporting NUREG discussed in your memorandte to D. Ross, dated August 8,1980, should be prepared.
As you pointed out in that meneranduw, a consnitment to have the NUREG available, before the guide is. issued, was rede by HRR to the ACRS at its January 5,1979, meetin
, ! understand that your staff is attempting to have this NUREG red by a local consultant.
Any questions should be directed to Earl H. Markee, Accident Evaluation Branch.
\\,
YW n
SRMa,.,
BGrimes Thomas E. Murley, Director C
a 12/y/60 12/AT/80 civtsien of Safety Technology Office of 'tuelcar Reacter Regulation
~
m r J CST:RSCB
! DST:PECB i L:5 MG D ~
mu u m.- FCote,jc oW n
Mar h Krege FScnroeder
_]TMurley
_mEo p,eo p e sc up
- m e
i m
.cm. m m - -
....