ML19276H407
| ML19276H407 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/22/1972 |
| From: | Schierling H US ATOMIC ENERGY COMMISSION (AEC) |
| To: | Deyoung R US ATOMIC ENERGY COMMISSION (AEC) |
| References | |
| NUDOCS 7910180711 | |
| Download: ML19276H407 (1) | |
Text
Y
/ g
[ NN['I%
~
UNITED STATES 5
h, ATOMIC ENERGY COMMISSION
'I WASHINGTON, D.C.
20545
'/
\\.
March 22, 1972 R. C. DeYoung, Assistant Direct.or for Pressurized Water Reactors,, DRL THRU:
Karl Kniel, Chief, PWR Project Branch No. 2, DRL
/t, IEETING WITH METROPOLITAN EDISON COMPANY - CENEPAL PUBLIC UTILITIES -
THREE MILE ISLAND UNIT 1 (DOCKET NO. 50-289)
Enclosed is a summary of a meeting held on March 21, 1972 in Bethesda with Metropolitan Edison Company - General Public Utilities.
Subject of the meeting was the applicants' Industrial Security Plan. An attendance list is also enclosed.
- y. CAa,.e c H. Schierling PWR Project Branch No. 2 Division of Reactor Licensing
Enclosures:
1.
Meeting Summary 2.
Attendance Lis't ec: w/o encls Docket File DRL Reading PWR-2 (w/ encl)
P. A. Morris F. Schroeder T. R. Wilson R. S. Boyd D. J. Skovholt H. R. Denton E. G. Case R. R. Maccary PWR Branch Chiefs R. W. Klecker CO (2)
H. Schierling (w/ enc 1)
D. Ross F. W. Karas (2)
D. Van Niel (w/ encl)
\\
79101807/[
h[