Summary of 740711 Safety Site Visit at TMI-1 to Compare Health Physics Aspects in Preparation of Draft First Round Questions for TMI-2 FSAR
ML19276H379
Person / Time
Site: Crane 
Issue date: 07/26/1974
From: Lessler R
US ATOMIC ENERGY COMMISSION (AEC)
To: Harold Denton
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7910160713
Download: ML19276H379 (2)


Text

9 -2H 4

JUL 2 e p Harol:1 R. Denton, Assistant Director for Site 01faty,~.

T CU: Uillina E. Kreger, Leader, Radiation Protection Section, RAS /L TRI? 2EPORT TO TILLFE MILE ISLAND WCLEAR STATIO?!

On July 11, 1974, I went on the Safety Site Visit to Three Mile Island Nuclear Station.

I nrrived at the plant around 10:00AM with B. Fashburn, F. Congel, and C. Ferrell of Licensin;r. Around ll:00AM, I was taken into the office of the TMI Unit 1 health physicist, Ken Deale, by Ton Jenckes sino coordinated the trip for Metropolitan Edison. Also. in the office to make an inspection, was Ralph Mrer of AEC Ccopliance.

I explained to Beale that I wanted to see and co' spare Units 1 and 2 and discuss ey draf t Q-l's on chapter 12 of the FSAR of Unit 2.

He said he would take care of this after taking care of Mycr. At 3:30PM, af ter nu:ierous postponernents,

I and Myer were finally taken around Unit 1 by Mike Buring who was on loan to TMI from Metropolitan Edison's RMiation Safety Section in Reading as

'deale was still tied up in meetings.

Euring had never been in Unit 2 and was not familiar with Chapter 12 of the FSAR. Altho he gave an interesting one hour tour of Unit 1, he was not able to give me a tour of Unit 2 or answer tmst of my questions concernin;;

Chapter 12 which vna the purpose of my visit and which are duo July 19.

Upon leaving the administration building at hbout 4:45PM, I was introduced to Tom Bacr who I was told was responsible for Chapter 12 of the Unit 2 FSAR.

He said he would like to discuss Chapter 12 with me some other time.

Since I was not able to see Unit 2 and discusa Chapter 12 on this site visit, I gave the LPM, B. Washburn, a list of things to observe and questions to ask on the next safety site visit July 17 and 18.

Despite making advance arrangements, Washburn was not abic to see Unit 2 on the July 17-18 site visit or discuss sufficiently the Chapter 12 draf t question with the appropriate people during normal workin.: hours.

Q l'I20 079 Richard Lessler l'adiatien Protection Section ec: see next page Bediolo;;1 cal Assessment Branch, SS/L o rica,

L:RA{

L:RA RLessler:es W

._, Kreger_..

. u.u 7/M/74 7//4/74 4

ona*

7 910 J sC]/ '3 rorm Arc.us ute. 9 m Arc.w o2 0 ao c4 i=

ai.. -' vaa m

alf-;

liarold R. Denten cc:

F. Schroeder A. Gia busso V. Moore K. Kniel

3. Washburn SS/ilC's A. Kenneke 73R Local-FDR ACRS (10)