ML19276H369

From kanterella
Jump to navigation Jump to search
Reaffirms Tech Specs Requirement for All Nuclear Plants of Necessity of Physics Testing on Control Rod Limiting Positions
ML19276H369
Person / Time
Site: Crane 
Issue date: 06/12/1974
From: Bernero R
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7910160704
Download: ML19276H369 (1)


Text

-

ocket No. 50-289 License No. DPR-50 M 13 E74 NOTE TO FILES On May 30, 1974, I discussed Technical Specification 3.5.2.5 (Control Rod Positions) with L. Spessard of R0-I and D. Grace of Metropolitan Edison Company. The core imbalance requirements section (3.5.2.5.d) does not explicitly exempt physics testing.

I pointed out that this is an editorial oversight; the Technical Specifications of this plant as well as others of this type were intended to include the physics testing exemption on each of the control rod position limiting conditions.

This section will be corrected at the first opportunity.

l

's Robert M. Bernero, Project Manager Light Water Reactors Branch 2-3 Directorate of Licensing cc:

L. Spessard, R0-I D. Grace, Meted R0-HQ AEC PDR LPDR Docket Files LWR 2-3 Reading RBernero, LWR 2-3 1420 057

.c QL q910160 l