ML19276H344

From kanterella
Jump to navigation Jump to search
Forwards Util 740204,740514,740913 & s Responding to NRC Request for Justification of Use of Unmodified Motors to Power Reactor Bldg Spray Pumps.W/O Encl
ML19276H344
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/02/1974
From: Goller K
US ATOMIC ENERGY COMMISSION (AEC)
To: Schroeder F
Office of Nuclear Reactor Regulation
References
NUDOCS 7910160684
Download: ML19276H344 (2)


Text

.. _ _

=

JEC 2 574 Occhet Je. 30-Cie T.

Schroeder, Acting Deputy Director for Icchnical Review, Licensing T2CI !ICAL ASb! STANCE REf7 JEST

' lour assistance is requested for the following:

PLA>;T NA'E:

Three :Ille Island, Unit 1 DCC12T IE GI2:

50-2S9 (License No. DPR-50)

RESI'ONSI"LE 32A :CH:

070-3 CO:: TACT:

D. Jaffe (27435)

TECHNICAL RE7IEW ERA';ChES:

EISCSB DESCRIPTION OF REOUEST:

Three liile Island Unit 1 (TMI-1) Ims two of the Westinghouse-Buffalo motors of the group found to have slow starting characteristics.

In response to an inquiry by P.egulatory Operations (RO),

Metropolitan Edison Company wrote to Dr. Knuth of RO on February 4, 1974 justifying the use of these two motors, without modificaticn, to power the two

, s',,

reactor building spray punps.

On i

February 21, 1974 R0 asked Reactor (2\\'.

Licensing to evaluate this matter.

T*+

After seme internal discussien with Technical Review we asked the applicant on March 29, 1974 to submit a reanalysis with corroborating test data.

The licensee responded by letter of May 14, 1974 TR reviewed that response under TAR-962 and reported on July 9, 1974 that the licensee's analysis was insufficient to resolve the question of the motor's adequacy.

Further inquiries ware transmitted to the licensee by our letter of July 26, 1974.

'12J U24 rg910160

"hc licensee reccert'c.? b> ictters cf Scpte-.bcr 13 and f cpt e.':er 3f:.

l 7 2.,

presentina cdditicnal analyser: ecyics of these letters ar encloaci for ycur convenienca.

    • e request thne you review t'11c entir '

catter, including the latcst respensec, and provide us a safety evaluation which vill, anong other thints, dete.ine whether it le acceptabic to rely on the spray pu=p notors as they are, or whether they should be repaired or replaced.

T.\\ECET DX~". F0E C0'TLETIM;:

Decenbcr 31, 197'.

15l arl ?. Gcller, Assistant Director g

for Operating Reactors Directorate of Licensin;,

Enclosures:

l.

Ltr fr '!etEd to ASchwencer dtd 9/13/74 2.

Ltr fr 'etrd to ASchwencer dtd 9/30/74 cc:

T. Ippolito DISTRIBUTION:

w/encls:

Docket 50-289 AMarinos, L:EICS DJaffe L:0RB#3 w/o encls SHanauer, DRTA AGiambusso, L:RP SVarga, L:RP RBernero, L:LMFER CMiller, L:EICS KGoller GLear, L:0RB#3 1 /,l 2IJ 0 2 5 (1.Q.y4..

_.1;0RB#3 1;

Rs_.

orric

  • _.L.;.LMFB F3

.u a = =

  • RMB.e eEoilc:tf -_ DHJa GLear.$.b.bd511er_...

111'44._ /l4...114 2I ll4 11L.2.2._/Z4..112.C L /74..

o.r=

  • Form AEC.318 (Rev. 9 5)) AECM 0240 W u. s. oavsmawant paintino orrics: s on.sse.see