ML19276H327

From kanterella
Jump to navigation Jump to search
Discusses Necessary Clarification to TMI-1 Tech Specs Section 1.7 Re Number of Closed Maint Doors Necessary During Reactor Operation
ML19276H327
Person / Time
Site: Crane 
Issue date: 06/12/1974
From: Bernero R
US ATOMIC ENERGY COMMISSION (AEC)
To:
US ATOMIC ENERGY COMMISSION (AEC)
References
NUDOCS 7910160669
Download: ML19276H327 (1)


Text

-s l

Ni 12 574

\\6ocket No. 50-289 License No. DPR-50 NOTE TO FILES On May 17, 1974, I discussed Section 1.7 (Containment Integrity) of the Technical Specifications with J. Herbein (Station Supt.) and L. Spessard (RO-I Inspector). A question had arisen about whether 1.7b permitted door seal maintenance or repair during reactor operation.

I stated that Section 1.7b should be construed to include such door seal work provided the other door of the affected air lock is kept shut. Consideration will be given to clarification of this section at the next convenient opportunity.

m.

Robert M. Bernero, Project Manager Light Water Reactors Branch 2-3 Directorate of Licensing cc:

L. Spessard, R0-I J. Herbein, Meted AEC PDR LPDR R0-HQ Docket Files LWR 2-3 Reading 1417 356 pc' 7910160h P