ML19276H184
Jump to navigation
Jump to search
| ML19276H184 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/10/1976 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML19276H183 | List: |
| References | |
| 50-289-76-09, 50-289-76-9, NUDOCS 7910150398 | |
| Download: ML19276H184 (1) | |
Text
.
License No. DPR-50 APPENDIX A NOTICE O ? VIOLATION Based on the results of the NRC inspection conducted on April 6-9, 12-16 and 21, 1976, it appears that one of your activities was not conducted in full compliance with the conditions of your NRC Facility License No. DPR-50 as indicated below.
Technical Specification 6.8.1 (formerly 6.2.3) requires that written procedures be established and implemented.
j Contrary to the above, on February 14, 1976 the Quadrant Power Tilt and Core Imbalance, between 1600 and 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br />, were not recorded as i
required by SP-1301-1, Shift and Daily Checks.
This is a Deficiency.
1413 208' f
7910150
/[
-- -