ML19276G974
| ML19276G974 | |
| Person / Time | |
|---|---|
| Site: | National Bureau of Standards Reactor |
| Issue date: | 08/14/1979 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rozier Carter NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (FORMERL |
| References | |
| NUDOCS 7908310230 | |
| Download: ML19276G974 (1) | |
Text
- in neog IN
+
o UNITED STATES E j ) v(g[,,g NUCLEAR REGULATORY COMMISSION
- }A. '.y
- )
- l REGION l 0, ',
g 631 PARK AVENUE
%, O
,o#
KING OF PRUS$1 A, PENNSYLVANI A 19406 August 14, 1979 Docket No. 50-184 U. S. Department of Commerce National Bureau of Standards ATTN:
Dr. R. S. Carter, Chief Reactor Radiation Division Washington, D.C. 20234 Gentlemen:
With this Information Notice the Nuclear Regulatory Commission is extending an existing mechanism previously used for informing facility licensees of signifi-cant operating events to include informing operator licensees of significant events which could impact on conditions of their NRC licenses.
It is requested that you provide copies of this Information Notice to all NRC licensed indivi-duals at your facility.
No specific response is requested at this time.
If you have questions regarding this matter please contact this Office.
Sincerely,
/Y k V
Boyce H. Grier Director
Enclosures:
1.
IE Information Notice No. 79-20 2.
List of IE Information Notices Issued the Last Six Months
' " 'i f) 254 710831033o
y ENCLOSURE 1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 IE Information Notice No. 79-20 Date: August 14, 1979 Page 1 of 3 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS
Background:
In the past, NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses.
These items of noncompliance can generally be characterized as serious or repeated failures to follow reactor operating procedures. Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code of Federal Regulations have raised questions about the exercise of their responsibilities.
The purpose of this Information Notice is two-fold:
(1) To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility, administrative procedures, and (2) To sumarize the enforcement sanctions available to the NRC for use against licensed individuals.
Description of Circumstances:
1.
Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordance with NRC requirements to assure that public health and safety are protected.
The role of NRC licensed individuals is no less important in the overall Regulatory scheme.
The NRC recognizes that timely actions by NRC licensed individuals are an important part of safety.
Reliance on these actions is a part of the defense-in-depth concept.
Specifically, the NRC requires that:
(1) Only licensed operators are permitted to manipulate the controls that directly affect reactivity (10 CFR 50.54 (i))
'I)46 255 (2) Licensed operators are requir times during the operation of DUPLICATE DOCUMENT Entire document previously entered into system under:
ANO No. of pages:
[