Text
Ii Conunonwealth Edison One First National Plata. Chicago. Illinois Address Reply to. Post Office Box 767 Chicago, Illinois 60690 July 5, 1979 Mr. J. G.
Keppler, Director Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
SUBJECT:
Dresden Station Units 1, 2 and 3 Quad-Cities Units 1 and 2 Zion Station Units 1 and 2 LaSalle County Station Units 1 and 2 Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 Response to IE Bulletin 79-02 and 79-02 (Revision 1)
NRC Docket Nos. 50-10/237/249, 50-254/265, 50-295/304, 50-373/374, 50-454/455, and 50-456/457 REFERENCE (a):
March 8, 1979 letter from James G. Keppler to Byron Lee, Jr. transmitting IE Bulletin No. 79-02.
(b):
June 21, 1979 letter from James G. Keppler to Byron Lee, Jr. transmitting IE Bulletin 79-02 (Revision 1).
(c) :
March 13, 1979 letter from Cordell Reed to James G. Keppler transmitting response to IE Inspection Report Nos. 50-373/79-04 and 50-374/79-01.
Dear Mr. Keppler:
Reference (a) transmitted IE Bulletin 79-02 regarding
" Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts."
Reference (b) transmitted Revision 1 to that bulletin which provided supplemental information to and clarification of the original bulletin.
g4/
JUL 9 1878 060\\\\\\
790B
L-NRC Docket Nos. 50-10/237/249, Commonwealth Edison 50-254/265, 50-295/304, 50-373/374, 50-454/455, 50-456/457 Mr. J. G. Keppler July 5, 1979 Extensive effort has been expended since the receipt of the bulletin to address the issues raised.
Commonwealth Edison has undertaken a comprehensive program applicable to all of the operat-ing plants and plants under construction in our system to resolve those concerns.
A detailed discussion of this program is provided in the attachment to this letter, as well as a discussion of those portions of the program that are now complete.
In addition, per Reference (c) Commonwealth Edison indi-cated that Morrison Quality control had initiated a 100% bolt torque audit of anchor bolts being installed at LaSalle County Station.
This program continued through May 31, 1979 at which time it was evaluated based upon the audit results.
The evaluation indicated that the program was working very well.
Hence, Commonwealth Edison has decided to continue the program at LaSalle County Station.
Please address any additional questions that you might have regarding this matter to this office.