ML19276G294

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-07, Seismic Stress Analysis of Safety-Related Piping. A/E Currently Testing Seismic Stress on safety-related Piping.Results Will Be Reported Per Show Cause Order Issued 790313
ML19276G294
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/16/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
JAFP-79-183, NUDOCS 7905240290
Download: ML19276G294 (1)


Text

)

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FITzPATRick NUCLEAR POWER PLANT ,,

JOHN D. LEONARD, JR.

Resident Manager 9

April 16, 1979 P.O. BOX 41 Lycorning, New York 13093 315 342 3840 JAFP-79-183 Mr. Boyce H. Grier, Director United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

SUBJECT:

NRC ISE BULLETIN 79-07 SEISMIC STRESS ANALYSIS OF SAFETY-RELATED PIPING _

Dear Mr. Grier:

The following response is for record purposes only.

The seismic stress analysis regarding safety-rel ted piping at the James A. FitzPatrick Nuclear Power Plant is presently being conducted by the architect-engineer. Results of this analysis will be reported as directed in the Show Cause Order which was issued on March 13, 1979 that required shutdown of the James A.

FitzPatrick Nuclear Power Plant.

Ver rug yours,

/

lh - 9 JDL:brp J+ 'llARD, JDHN D. LEUR

'MnJR. g' /

CC: G. T. Berry, PASNY, NYO ,

[

G. A. Wilverding, PASNY, NYO P. W. Lyon, PASNY, NYO M. C. Cosgrove, JAF R. J. Pasternak, JAF Document Control Center 790524011o Q