ML19276G153

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-1257/79-01 on 790212-16.No Noncompliance Noted
ML19276G153
Person / Time
Site: Framatome ANP Richland
Issue date: 03/16/1979
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Nechodom W
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
Shared Package
ML19276G154 List:
References
NUDOCS 7905150686
Download: ML19276G153 (2)


Text

A

(

4).C -

g O

UNITED STATES c

y 1,_

,- 1 NUCLEAR REGULATORY CO.". '.11sslON hp,k REGION V

.j S% b, c[

SUITE 202. WALNUT CREEK PLAZ A

\\ ' ~' " g s 990 N. CALIFORNI A BOULEV A R D

    • ee*

W ALNUT C REEK. CALIFORNI A 94536 Ubit i a gg Docket tio. 70-1257 Exxon Nuclear Company 2101 Horn Rapids Road Richland, Washington 99352 Attention: Mr. W. S. Nechadom, Manager Licensing and Compliance Gentlemen:

Subj ect: NRC Inspection of Exxon Nuclear Ccmpany This refers to the inspection conducted by Messr. W. J. Cooley and P. R. Zurakowski on February 12-16, 1979 of activities authorized by NRC License No. StOt-1227, and to discussions of ou: findings held by those persons with members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, inter-views with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the scope of this inspection.

In accordance with Section 2.790 of the tiRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be proprietary, it is necessary that you submit a written application to this office, within 20 days of the date of this letter, requesting that such information be withheld from public disclosure. The applica-tion must include a full statement of the reasons why it is claimed that the information is proprietary. The application should be prepared so 7905150(:v%

Exxon Nuclear Company G.4i? y 3 gg that any proprietary information identified is contained in an enclosure to the application, since the application without the enclosure will also be placed in the Public Document Rocm.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you h e any questions concerning this inspection, we will be glad to disc -s them with you.

Sincerely,

fu em i

H. E. Book, Chief Fuel Facility and Materials Safety Branch

Enclosure:

IE Inspection Report No. 70-1257/79-01

.