Text

M'

g

UNITED STATES

4

4

NUCLEAR REGULATORY COMMISSION

.,

E

E

REGION I

Ek

631 PActK AVENUE

KING OF PRUS$1 A. PENNSYLVANI A 19406

16 FEB 1979

Docket No. 50-225

Rensselaer Polytechnic Institute

ATTN:

Dr. R. T. Lahey, Chairman

Department of Nuclear Engineering

and Science

Department of Nuclear Engineering and Science

Troy, New York

12181

Gentlemen:

Subject:

Inspection 50-225/79-01

This refers to the inspection conducted by Mr. T. Stetka of this office

on February 1-2, 1979, at Rensselaer Critical Facility, Schenectady, New

York, of activities authorized by NRC License No. CX-22 and to the

discussions of our findings held by Mr. Stetka with Mr. P. Nelson of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section

2.790. The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

7903300 %

.

.

Rensselaer Polytechnic Institute

2

16 FEB 1979

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

1

-

ldo J Brunner, Chief

Reac or Operations and Nuclear

Su port Branch

Enclosure:

Office of Inspection and Enforcement Inspection Report

Number 50-225/79-01

cc w/ enc 1:

Dr. D. R. Harris, Facility Director

Dr. S. E. Wiberley, Vice Provost and Dean of the Graduate School