ML19276E973

From kanterella
Jump to navigation Jump to search
Forwards Revision 1 to Hematite Emergency Plan as Result of Comments Discussed at 781117 Meeting.Encl Discusses Plan for Low Enriched Oxide Conversion Plant
ML19276E973
Person / Time
Site: 07000036
Issue date: 02/13/1979
From: Eskridge H
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
To: Crow W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
Shared Package
ML19276E974 List:
References
NIS-79-608, NUDOCS 7903260193
Download: ML19276E973 (1)


Text

.

tl C-2 Power sfstems Tel. 314;'937 467; n[

Combustion Engineenng. 'nc.

3141296 5640 r,

' ')

R u e O'.A Hem 4hte, Missovn 63047 NIS/79/603 W POWER u 43

' m3 SYSTEMS iG 13.

_, _C '.01 February 13, 1979 Mr. W. T. Crow Section Leader, Uranium Fuel Fabrication Section Fuel Processing and Fabrication Branch U.S. Nuclear Regulatory Commission Washington, D.C. 20555 i

j

Dear Mr. Crow:

Enclosed is Revision 1 to the C-E Hematite Emergency Plan.

Modifications were made in accordance with questions and comments discussed during our November 17, 1978 meeting. Changes are j

denoted by an asterisk in the right margin of the revised ages.

j Very truly yours, COMBUSTI0ft E!!GINEERIflG, INC.

~

H. E. Eskridge i

Supervisor, Nuclear Licensing, Safety and Accountability

/wg Enclosure s

' A

' %,w "

a b

oJUP U.4 o 7903260193 i;

..J