ML19276E935
| ML19276E935 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 02/28/1979 |
| From: | Kaplan A GENERAL ELECTRIC CO. |
| To: | Crow W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 7903260067 | |
| Download: ML19276E935 (1) | |
Text
./
/b/L GENER AL $ ELECTRIC NUCLEAR ENERGY PRODUCTS DIVISION WILMifJGTON MANUF ACTURING DUARWW CAST LE H AYNE HO AD. P. O. DOX 780. WILMINGTON, N. C. 28401. (319) 343-5000 February 28, 1979 Director Office of Nuclear tbterial Safety & Safeguards U. S. Nuclear Regulatory Conmission Washington. D. C.
20555 Attention: Fir. W. T. Crow, Section Leader Uranium Fuel Fabrication Section Fuel Procccsing & Fabrication Brandl Division of Fuel Cycle & Material Safety
Dear Sir:
References:
(1) NTC License SIN-1097, Docket *70-1111 (2) Letter, J. B. Fhrtin to A. L. KaplaC 2/27/78 (3) Letter, A. L. Kaplan to J. B. Martin, 8/28/78 (4) Letter, W. T. Crow to A. L. Kaplan, 11/10/78 (5) Letter, A. L. Kaplan to W. T. Crow, 11/27/78 (6) Letter, A. L. Kaplan to W. T. Crow,1/9/79 (7) Irtter, A. L. Kaplan to W. T. Crow, 2/27/79
Subject:
FRERGENCY PIAN With reference to activities authorized by SIN-1097, General Electric Conpany submitted a copy of the teD Pnergency Plan for your review on 1/9/79, portaining to the GE fuel fabrication plant in Wilmington, N. C.
As a result of your review, several questions were raised conmrning plan content and answers were subnitted (ruference 7).
As a result of those questions, attadled hereto is the revised Emergency Plan for the Wilmington Manufacturing Departnent.
Very truly yours, GENERAL ELECTRIC CGIPR N j,
Arthur L. Kapltui, thnager Licensing & Conpliance Audits tVC J26 ALK:bnw Attadumnt cc: Fir. D. J. Perotti, NRC-Atlanta NSD-L 13133 7903280 o67