ML19276B043
| ML19276B043 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/23/1984 |
| From: | Mark Miller Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8405140048 | |
| Download: ML19276B043 (3) | |
Text
/U [ C
[M{
[g >R HEGg,
'o UNITED STATES
'g
[ j* 3. f g
NUCLEAR REGULATORY COMMISSION WASHINGTON, D, C. 20555 s+
'%.."... #g April 23, 1984 Docket Nos.:
50-424 and 50-425 APPLICANT:
Georgia Power Company FACILITY:
Vogtle, Units 1 and 2
SUBJECT:
HYDROLOGIC SITE VISIT TO V0GTLE ON FEBRUARY 6,1984 On February 6,1984, the staff met with representatives from Georgia Power Company, Southern Company Services, Inc., and Bechtel to tour the site and discuss staff tuestions in the hydrologic engineering review area.
Participants are listed in E1 closure 1.
A brief meeting was held to discuss staff questions and go over items tie staff wanted to accomplish during the site visit.
The staff toured the site to view the river intake and vicinity, the mechanical draft cool;ng towers, the reactor basemat and ditches, and other features pertaining to site sainage.
This site was actually too early in the construction process to be able to adequately observe many of the features pertinent to the hydrologic review. A later visit may be planned.
During the afternoon of February 6, the staff discussed the questions in detail as well as the some of the applicant's projected responses and solutions.
2 n
4 [t u b.
N Melanie A. Miller, Project Manager Licensing Branch No.
4 Division of Licensing cc:
M. Fliegel G. Staley 840514004s e404p3 PDR ADOCK 05000424 A
ENCLOSURE 1
~
Vogtle Hydrologic Site Visit NRC Georgia Power M. Miller D. Hudson G. Staley E. Groover J. Belcher Southern Company Service Bechtel S. Khan A. Wehrenberg K. Kopecky W. Rowe F. Brizendine
q.
(
V0GTLE Mr. Donald Foster Vice President and Project General Manager Georgia Power Company P.O. Box 299A, Route 2 Waynesbore, GA 30830 cc: Mr. L. T. G6 cwa' Mr. William S. Sanders Chief Huclear Engineer Resident Inspector /Puclear Regulatory Georgia Power Company Commission P.O. Box 4545 P.O. Box 572 Atlanta, Georgia 30302 Waynesboro, Georgia 30830 Mr. Ruble A. Thomas Deppish Xirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtie Pro.iect Counsel Georgia Power Compa; y/
32 Peachtree Street, N.W.
Southern Corapany Services, Inc.
Suite 225 P.O. Box 2625 _
Atlanta, Georgia 30303 Birmingham, Alaoama 35202 James E. Joiner Mr. R. E. Conway
- Troutman, Sanders, Lockerman, Senior Vice President - Nuclear
. Candler Building
& Ashmore Po er w
Georgia Power Company 127 Peachtree Street, N.E.
P.O. Box:4545 Atlanta, Georgia 30303 Atlanta, Georgia 30362 Douglas C. Tepec Mr. J. A. Bailey Georgians Against Nuclear Energy Project Licensing Manager 1209 N. Decatur Road Southern Company Services, Inc.
Atlanta, Georgia 30306 9.0. Boy.2625
~
Birmfngham, Alabama '35202 Laurie Fowler Legal Environmental Assistance Ernest L. Blake, Jr Foundation Shaw, Pittman., Pottssand Trowbridge 1102 Heel) Building 1800 M Streat, N.W.
Atlanta, Georgia 30303 Washington, D. C.
20035 Mr. G. Bockhold, Jr.
Vogtle Plant Manager Georgia Pover Company Poute 2, Sp.t 293-A Waynesborn; Georgia 30830 Mr. James P. O'Reilly Nuclear Regulatcry Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303