ML19275E043

From kanterella
Jump to navigation Jump to search
PNS-IV-80-009:on 800422,bomb Threat Was Received by Channel 2 Tv,Baton Rouge,La.Site Evacuated & Search Made.Police & FBI Notified.No Press Release Will Be Issued
ML19275E043
Person / Time
Site: River Bend  Entergy icon.png
Issue date: 04/22/1980
From: Crossman W, Oberg C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNS-IV-80-009, NUDOCS 8005150209
Download: ML19275E043 (1)


Text

gW 80051 50267

! D LM hKELIMINARYNOTIFICATION i

u i

e April tt, 1300 PRILIMINARY NCTIFICATION OF SAFEGUARDS EVENT -- PNS-IV-80-09 This preliminary notification constitutes EARLY notice of events of POSSIBLE national securirv or pubMn intercat significance. The information presented is as initially received without verification or evaluatio:t and is basically all that is known by IE staff as of this date.

FACILITY: River Bend Station, Units 1 & 2 Gulf States Util.ities (GSU)

DN 50-458; 50-459

SUBJECT:

BOV.B THREAT At 11:05 a.m. on April 22, 1980, the receptionist at Chntmel 2 TV, Baton Rouge, Iouisiana, received a telephone call as follows:

"Do you all vant so=e good news? Be at the nuclear plant site at 12:30 today and see a bo=b go off."

The receptionist reported that the voice was that of an adult male.

Channel 2 notified Gulf States Utilities. The oite was evacuated and a search was cade. Workers were permitted to leave without pay.

Previous bomb threats were made to the River Bend site on April 14 and 15,1980 (PNS-IV-80-06; PNS-IV-80-07).

The licensee notified the state police officials and the FBI.

RIV notified the ATT, the IAT, and the office of Co---issioner Kennedy by telephone on April 22, 1980.

No priass release was made or planned by the licensee or NRC.

The site construction progress is approximately 12%.

There is no SNM on site.

Thirf Preliminary Notification is issued for infor=ation only and no further action by ?E is anticipated. Region IV, Arlington, Texas, received notification of this ocettrence by telephone from the GSU construction Manager at approximately 1:30 p.m.

on April 22, 1980.

Centact:

C. R. Oberg, RIV 334-2411; W. A. Cross =an, RIV 334-2411 Dis tribution:

Transmitted H St.

Chairman Ahearne Co==issioner Hendrie S. J. Chilk, SECY Co:..-issioner Gilinsky Co desioner Bradford C. C. Ra=nerer, CA Co=1ssioner Kennedy ACES (For Distribution)

Transmitted: MNBB P. Bldg.

IE:XOOS (II:EQ Dis-W. J. Dircka, EDO H. R. Denton C. Michelson, EDO R. J. Mattson, NRR SS Bldg.

J. J. Fouchard, PA D. Vassallo, NRR J. G. Davis, miSS F. M. Es11er, HPA n, riconhue, NRR R. Budnit?, WRA R. G. Ryan, OSP J. J. Cn hdngs, CIA U. K. Shapar, ELD (HAIL)

R. Minogue, SD IE:XOOS RI, RII

,,,RIII RV PRELIMINARY NOTIFICATION

.