..,j MEMORANDUM FOR: Roger J. Mattson, Director, DSS, NRR FROM:
Guy A. Arlotto, Director DES, SD
SUBJECT:
ACTIONS NECESSARY TO IMPLEMENT THE TMI ACTION PLAN NEAR-TERM OPERATING LICENSE REQUIREMENTS An ad hoc subgroup met on January ll,15 and 22,1980, to consider the need for changes in NRC's regulations in order to implement the Near-Term Operating License Requirements. Those participating were:
Warren Minners, NRR Jim Stone, IE Jim Wolf, ELD A. L. Eiss, SD G. A. Arlotto, SD (Chairman)
Our recomendations are enclosed. Also enclosed is a memorandum from ELD stating "no legal objections to the recomendations" and providing additional views regarding implementation of these recomendations.
This completes our assignment.
)
16I0 12: a Guy A. Arlotto, Of rector Division of Engineering Standards Office of Standards Development
Enclosures:
bec w/encls: RBMinogue 1.
Actions Necessary to GAArlotto Implement the TM! Action ALEiss Plan, Near-Term Operating WMinners License Requirements JStone 2.
Memo from GCunningham, ELD, JWolf to GAArlotto, SD dtd 1/25/80 RETYPED FOR MINOR CHANGE -- SEE PREVIOUS CONCURRENCES DISTRIBUTION SD RF/AL.cHA CENTRAL FILES DES SUBJ/ ALE RF SD TASX NO. N/A ornce > ! _Sh0ESlIa, NRR
, _I,E,,,, _ _, _,,,,, ELD,, __ __ _,,JSD,: DES __,,j,,,,,,,,_,,,
su=an >.AL11.ssumd_ j Einners______451oAe.___ __.dWol f GAArlotto sare > ! _1L2Jz80
'l/23/80
- 1/23/80 11 / /80 1,2 S/80 i
'4RC Form 318.N61 NPCM 0:040 t u.
- s. nvenwee se:UtNG :F*tca 273-ss3 :st, 8 0022 9 OD/[4
\\
\\
\\
/
MC40RANDUM FOR: Ro er J. Mattson, Director,/ bS,NRR FRCM:
Guy A. Arlotto, Director / DES, SD
SUBJECT:
ACTIONS CESSARY TO IMPLEMENT THE TMI ACTION PLAN NEAR-TERM ERATING LICENSE REQUIREMENTS N/
An ad-hoc subgroup met on Januarfsl7,15 and 22,1980, to consider the need for changes in NRC's regulat16as in order to implement the Near-Term Operating License Requirements, o' a participating were:
Warren Minners, NRR Jim Stone. IE Jim Wol f. ELD A. L. Eiss, SD G. A. Arlotto, SD (Chat. n)
/
Our recomendations are attached. This complete our assignment.
/
(s,L>*.
Guy A. Arlotto Di tor Division of Engineefing Standards 5
Office of Standards Dkvelopment
/
Y f '6
Enclosure:
As s ted g
g 3
.M ' y;-
- u
,W DISTRIBUTION bcc:
R. B. Minogue QJ g
j Central Files G. A. Arlotto
\\ bf g SD Rd/ Alpha A. L. Eiss ES Rd/Subj W. Minners
@v'b ()
J 2 "z.
d y '.
J. Stone c (,f I,gjp [. -
50 Task No. n/a J. Wol f
/p-A W
ikA l (upt--_ _ _ _
. _ IEg&_ _ __ _ _. !___ll 6
a ica > !.S D4 s s____ ____
m e -l (M C4w
~
__. __ S Di:E3_j. _ _'_ _I_ __#L_ _
4 Jr,.
L suame > ; AL41ss:m..__j.minnsIC_gbf' b l e
_J5tooe.__
' p____TAaclatic.'
c a n > I 1 / ? ? /20___ ___ _I_1/g/10_ _ _ _ _ _ _11,3 L80_ _ __ } _ _lf___]8_0_ygf 1/yf,89__ _ i_ _ ___ _ _ __ __,
N AC Form 218 IN61 NRCM 02040 0.. s. m.casme - sa: r:=.r. : et E 2*3-4e3 IpVW dM M '
KLY H - Rule Change Required D - Rule Change Desirable U - Hule Change Unnecessary Actions Hecessary to Implement the 1111 Action Plan, Hear-Term Operating License Requirements Requirement Applicable Rule Interim f.hange Final Change 1.A.1.1 Shi f t Technical Advisor 50.34(b)(6)(i)
Letter to licensees U. Revise R.G. 1.8, 50.34(b)(7) and applicants SRP 13.1.1 50.57(a)(3) 1.A.l.2 Shi f t Supervisor Duties 50.54(1)
Letter U Revise R.G. 1.8 50.34(b)(6)(1) 1.A.1.3 Shi f t Manning (1) SRO and R0 in Control Room 50.54(k)
Tech Specs D. Revise 50.54(k) and 50.54(m) 50.51(m)
(2) Administrative Aide to Shift 50.34(b)(6)(i)
Letter U Revise R.G. 1.8 Supervisor 50.57(a)(3)
(3) Restrictions on Use of Overtime 50.34(b)(6)(i)
Letter U, Revise R.G. 1.8 50.34(b)(7) 50.57(a)(3) 50.57 (a)(6)()i) 50.34(b)
Letter U, Revise R.G. 1.8 1.B.1.1 Organization and Management (4
Criteria 1.B.3.1 Safety Engineering Group 50.34(b)(6)(i)
Letter U, Revise R.G.1.8 or 1.33 50.57(a)(4) 1.B.3.4 Resident inspector 50.70(a)
U, No change needed 50.70(b) 1.C.l.1 Analysis and Procedure Modi fica tion m
P (1) Small Break LOCA 50.46 Letter U. SRP g
50.34(b)(6)(v) g i
50.57(a)(3)
4 2.
Requirement Applicable Rule Jnterim Change Final Chan g I.C.l'.1 Analysis and Procedure
!!adi f icalion (Continued)
(2) Inadequate Core Cooling 50.34(b)(6)(v)
Letter U. SRP or R.G. 1.33 50.57(a)(3)
I.C.l.2 Shif t Relief and Turnover 50.34(b)(6)(iv)
Letter U, Revise R.G. 1.33 Procedures 50.57(a)(3)
I.C.I.3 Shift Personnel Responsibilities 50.34(b)(6)(i)
Letter U, Revise R.G. 1.8 50.57 (a)(3)
I.C.l.4 Control Room Access 50.34(b)(6)(v)
Letter U, Revise R.G. 1.33 50.34(b)(6)(iv) 50.57(a)(3)
I.C.2 Vendor Review of Procedures Part 50, Appendix B, Letter 11, None Cri teria I f. III
!.C.3 Pilot Program for Review of 50.70(a)
None 11, None Selected Emergency Procedures I.E.1 Licensee Operating Experience 50.34(b)(6)(1)
Letter U, Revise R.G. 1.8, 1.33, Evaluation Capability 50.57(a)(4) 1.70 f.E.2 Licensee Dissemination of Part 55 Appendix A Letter U, Revise R.G. 1.8 Operating Experiences 50.34(b)(6)(iv) 55.10(a )(6)
SS.33(a)(4)
Part 50, Appendix E.
IV. ll I.G. Training During Low Power Testing 55.iO(a)(6) t,,, tg p U, Revise R.G. 1.8 II.B.1 Degraded Core - Primary System 50.34(b)(2)
Letter D, new rul e Vent Part 100 Part 50 D, new rule 11.8.2 Degraded Core - Shielding Letter 50.34(b)(2)
App. A, C9C 61 Part 100 Part 50 II.B.3 Degraded Core - Sampling D, new rule 50.34 (b)(2) App. A. GDC 61 Letter
3.
Requ i remedit_
Applicable Rule Interim Channe Final Change 11.B.4 Degraded Core -Training 50.34(b)(6)IV Letter D, aew rule Part 50 App. E.IV.ll II.B.8 Degraded Core - Rulemaking 50.34(b)(2)
D, Advance ilotice o f D, tiew Rule Part 100 Rulemaking in Process II.B.10 Interim ilydrogen Control 50.44 R, revision to 50.44 R, revision to 50.44 Requirements for Small Containments II.C.l.1 - Mini IREP 50.34(b)(2)
Letter U, lione 55.57(a)(3)
II.C.l.8 Reliability Assurance Part 50, App. B Letter U, Revise R.G. 1.33 II.D.l.1 Relief & Safety Valve Test Part 50, App. A Letter U, Revise SRP 3.9.3 GDC 1 II.D.l.5 Relief & Safety Valve Position Part 50, App. A Letter U, Revise SRP GDC 13 II.E.1 Auxiliary Fee'; water System Part 50, App. A Letter U, Revise sup in,4.0 Rel ia bi l i ty GDC 34 II.E.1.3 Auxiliary Feedwater Initiation Part 50, App. A Letter U, Revise SRP 10.4.9 GDC 34 II.E.3 Emergency Power for Decay lleat Part 50, App. A Letter U, Revise SRP S.4.7 Removal GDC 34
.Part 50, App. E. IV.ll II.E.4.1 Containment Penetrations Part 50, App. A.
Letter U, already in SRP 6.5.1 GDC 41 II.E.4.3 Containment Isolation Part 50. App. A Letter U Already in SRP GDC 22 II.E.4.5 Containment Purge Part 50 App. A Letter U, already in SRP GDC 54 II.F.2 Inadequate Core Cooling Part 50. App. A Letter U, May require change to Ins trumen ts GDC 13 R.G. 1.97 i II.G Emergency Power for Pressurizer Part 50 App. A Letter U, may require R.G. revision GDC 17
4.
Requirement Applicable Rule Interim Change Final Change III. A.l.1 Role o f NRC III.A.I.5 Communications Part 50, App. E.
Letter U, Revise R.G. 1.101 IV.0 III.A.2.1 Technical Support Center Part 50 App. E.
Letter U, Revise R.G.1.101 IV.A Review SRP 6.4, 9.4.1, 9.5.2, 12.2, 12.3, 12.5 for possible revisions III.A.2.2 Onsite Operational Support Part 50, App. E.
Letter U, Rev i se R.G. 1.101, Center IV.A SRP 13.3 III. A.2.3 Near-Si te Emergency Opera tions Part 50, App. E.
Letter U, Rev ise R.G.1.107 Center IV.A III.A.3 Upgrade Licensee Emergency Part 50, App. E Letter U,flo change needed Preparedness III.B.3.2 fella-NRC Concurrence in State Part 50, App. E.
Letter D. Revise App. E and Local RERP IV.D al so R.G.1.101 III.D.1.3.a Area Radia tion f1oni tors Part 50, App. A Letter U, Revise SRP 12.5 (Partial)
GDC 64 Ill.D.2.1 Control Room liabi tabili ty Part 50, App. A Letter U, Revise R.G. 1.78 & l.95 GDC 4 III.D.2.2.b Evaluation of Secondary Part 50, App. A Letter U, Revise SRP 9.3.4, 11.3 Side Hazards GDC 61 III.D.2.2.c Improve Auxiliary Building Part 50, App. A Letter U, Revise SRP 9.3.4, 11.3 GDC 61 III.E.1.1 Improve Vent Gas Systems Part 50, App. A.
Letter U, Revise SRP 11.3 GDC 60 III.E.1.2.a Surveillance Testin9 Part 50, App. I Letter U, ALARA Tech Specs (Filtra tion Systems)(Partial)
III.E.2.1.b NRC Monitoring Part 50 App. A.
Letter U
.