Requests 90-day Extension to Complete Insps Required in IE Bulletin 79-13, Cracking in Feedwater Sys Piping, in Order to Complete Power Ascension Testing W/O Shutting Down to Perform Examinations
ML19275A519
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 08/21/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
2-089-12, 2-89-12, NUDOCS 7910040586
Download: ML19275A519 (2)


Text

i

', '=

~ g-u=e ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE HOCK. ARKANSAS 72203 (501)371-4000 August 21, 1979 2-089-12 Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Subj ect : Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 IE Ilulletin 79-13 (File: 2-1510.1)

Gentlemen:

As committed in our July 12, 1979, letter we will perform the inspections required by IE Bulletin 79-13, Item 1, on Arkansas Nuclear one -- Unit 2, after the completion of power ascension testing. We request a 90-day extension to complete the above mentioned inspections. Our bases for this request are as follows: -

1. A 90-day extension would allow us to complete power ascension testing without shutting down to perform the subject examina-tions. The requested extension allows for some expected delays in testing. ,
2. As described in our July 27, 1979, letter to Mr. Dacrel Eisenhut, the feedwater nozzle-to-pipe welds received a 100% radiography inspection after fabrication. In addition, all feedwater system welds received a preservice inspection in accordance with Section XI during July 1977.
3. The ANO-2 feedwater system has exnerienced a very limited number of thermal cycles due to the plant still being in power ancen-sion testing.

/: . We do not believe that the subject cracking is generic to Com--

bustion Engineering plants and do not feel the urgency implied in a 90-day reporting period is necessarily applicabic in this Case.

99904" 5 oeme m oom saur-unumssvsre f

s 9 .

Mr. K. V. Seyfrit, Director 2-089-12 August 21, 1979 Yours ve g truly, b CL Y 0 /

David C. Trimble Manager, Licensing DCT: MOW:nm cc: Mr. Norman C. Mosely, Director Division of Reactor Operations Inspection Nuclear Regulatory Commission 4350 East West Highway Bethesda, Maryland 20555 Mr. W. D. Johnson U. S. Nuclear Regulatory Commission P. O. Box 2090 Russellville, Arkansas 72801 1101 043