,:~.T ARKANSAS POWER & LIGHT COMPANY PCST CFFICE BOX 551 UTTLE RCCK. ARKA?SAS 72 (501) 3A,1,-g 3 August 27, 1979 3
.. M.
C' 7 O A:i. SF.0TICP 089-1 c
A Transportation Branch Division of Fuel Cycle and Material Safety S$p j
Nuclear Regulatory Commission l _
Washington, D.C.
20555 3
4 Der A, --
Attention:
Mr. C. E. MacDonald
%y t-1,
- ~h
., ji?q
/'C Chief, Transportation Branch b,-
Subject:
Arkansas Nuclear One-Units 1&2 "d
Docket Nos. 50-313 and 50-368 License Nos.
DPR-Si and NPF"6 10 CFR 71, Packaging of Radioactive Material for Transport and Transpor-tation of Radioactive Material Under Certain Conditions (File:
3905, 2-3905)
Centlemen:
In response to your letter of July 24, 1979 requesting that we reference the specific Arkansas Power and Light Company (AP&L) 0 2ality Assurance (QA) program document we intend to use to meet the requirements of 10 CFR 71.51, the following is provided.
The Operations QA program for Arkansas Nuclear One-Units 1 and 2 is as described in the AP&L Topical QA Report (APL-TOP-1A). The current ap-proved revision (Revision 4) was submitted for review August 1, 1977 and was subsequently approved and dated September 8, 1977.
Revision 5 (submitted June 11, 1979) is currently being reviewed by the NRC-QJ branch and is expected to receive approval in the near future. The applicable portions of the latest approved revision of APL-TOP-1A will be applied to the subject activities. Attachment A gives additional details regarding the applicable portions of 10 CFR 71, Appendix E.
Very truly yours, CAJ5 David C. Trimble 7
9 2
S DCT: ERG:nm i
Attachment 13033 veveea v'cces sev-ss svy$10 0 40 fg
. ~,
t ATTACHMENT A 10 CFR 71 Appendix E The following section of the most currently approved revision of AP&L TOP-1A will be applied as stated below (Note specific paragraphs are to rev. 4 para-graph numbers which could change during subsequent revisions).
Section 1 - Applicable Section 2 - Applicable Section 3 - Not applicable. AP&L will use only licensed packaging which has been designed under a QA program which has been sub=itted to the NRC for approval.
Section 4 - Applicable Section 5 - Applicable Section 6 - ApplAesble Section 7 - Applicable Section 8 - Generally applicable, except for paragraph 8.3.1.
Due to size, uniqueness, low volume, and the method of supplier identifica-tion of each package, AP&L tagging of each package is not nec-essary.
Section 9 - Not applicable; we do not consider this subject as a "Special Proc'ess" in the context of 10 CFR 71, Appendix E Criterion 9 which is a re-statement of Il CFR 50, Appendix B Criterion 9.
Section 10 - Applicable Section 11 - Not applicable; AP&L will not be testing the package in the context of 10 CFR 71, Appendix E Criterion 11 which is a re-statement of 10 CFR 50, Appendix 3 Criterion 11.
Section 12 - Applicable Section 13 - Generally applicable except for paragraph 13.4.
AP&L does not
" store" package, therefore the storage sectica does not apply.
Section 14 - Not applicable; see Section 11 coc=ents above.
Section 15 - Generally applicable except for the reference to procedure 1004.13 in paragraph 15.2.3.
Nonconfor=ing material or equipment will be returned to the van'or or will be replaced.
Section 16 - Generally applicable except for paragraph 16.3.1 which is not applicable; see Section 15 com ents above.
Section 17 - Applicable l (j 9 h } ] s Section 18 - Applicable 12033