Amends 54 & 53 to Licenses DPR-32 & DPR-37,respectively, Adding License Conditions Pertaining to Completion of Facility Mods to Improve Fire Protection Program
ML19275A309
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/19/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18130A259 List:
References
NUDOCS 7910040010
Download: ML19275A309 (4)


Text

.

gkm msg k

UNITED STATES gj-

[

'[' h NUCLEAR REGULATORY COMMISSION 3 y, C

WASHINGTON, D. C. 20555 x

9, '

s

/

VIRGINIA ELECTRIC AND POWER C0ffANY DOCKET N0. 50-280 SURRY POWER STATION, UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE A.endment No. 54 License No. DPR-32 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The facility will operate in conformity with the provisions of the Atomic Energy Act of 1954, as amended (the Act), and the rules and regulations of the Commission; B.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in conpliance with the Commission's regulations; C.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and D.

The issuance of this anendment is in accordance with 10 CFR Part 51 of the Commission's reEulations and all applicable requirements have been satisfiec.

2.

Accordingly, operating license DPR-32 is amended by adding paragraph 3.1 to read as follows:

3.I The licensee may proceed with and is required to complete the modifications identified in Paragraphs 3.1.1 through 3.1.30 of the NRC's Fire Protection Safety Evaluation (SE), dated September 19, 1979 for the facility. These modifications will be completed in accordance with the schedule in Table 3.1 of the SE.

If any modification cannot be completed on schedule, the licensee shall submit a report explaining the circumstances and propose, for staff approval, a revised schedule.

1098 030 1 91004o 9,o

. In addition, the licensee snall submit the additional infomation identified in Table 3.2 of this SE in accordance with the schedule contained therein.

If the information cannot be submitted on schedule, the licensee shall submit a report explaining the circumstances together with a revised schedule.

The 1icensee is required to implement and maintain the administrative controls identified in Section 6 of the NRC's Fire Protection Safety Evaluation on the Facility dated September 19, 1979 and supplements thereto.

3.

This license amendment becomes effective Octr.oer 16

,1979.*

FOR THE NUC1 EAR REGULATORY COMMISSION

/

cll//$t.

A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors Date of Issuance: September 19, 1979

  • Provided no hearing is requested under 10 CFR Part 2 Paragraph 2.204 1098 031

e o

pa "' cg'o, UNITED STATES

+

S N',,. q '%

NUCLEAR REGULATORY COMMISSION WASHING TON, D. C. 20555

~,

VIRGINIA ELECTRIC AND POWER COMPANY DOCKET N0. 50-281 SURRY POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE h endment No. 53 License No. DPR-37 1.

The Nuclear Regulatory Conmission (the Commission) has found that:

A.

The facility will operate in conformity with the provisions of the Atomic Energy Act of 1954, as anended (the Act), and the rul'es and regulations of the Commission; B.

There is reasonable assurance (i) that the activities aut 'orized by this amendment can be conducted without endangering the he slth and safety of the public, and (ii) that such activities will be conducted in compliance with the Conmission's regulations; C.

The issuance of this anendment will not be ininical to the c nmon defense and security or to the health and safety of the public; and D.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, operating license DPR-37 is amended by adding paragraph 3.1 to read as follows:

3.I The licensee may proceed with and is required to complete the modifications identified in Paragraphs 3.1.1 through 3.1.30 of the NRC's Fire Protection Safety Evaluation (SE), dated September 19, 1979 for the facility.

These nodifications will be completed in accordance with the schedule in Table 3.1 of the SE.

If any modification cannot be completed on schedule, the licensee shall submit a report explaining the circumstances and propose, for staff approval, a revised schedule.

1098 032

P00R~0RGINAL In addition, the licensee shall submit the additional information identified in Table 3.2 of this SE in accordance with the schedule contained therein.

If the information cannot be submitted on schedule, the licensee shall submit a report explaining the circumstances together with a revised schedule.

The licensee is required to implement and naintain the administrative controls identified in Section 6 of the NRC's Fire Protection Safety Evaluation on the Facility dated September 19, 1979 and supplements thereto.

3.

This license amendment becomes effective October 16, 1979.*

FOR THE NUCLEAR REGULATORY COMMISSION (t twt'h' Y i

c7 l A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors Date of Issuance:

September 19, 1979

  • Provided no hearing is requested under 10 CFR Part 2 Paragraph 2.204.

1098 033