ML19275A252

From kanterella
Jump to navigation Jump to search
Forwards Correction to Monthly Operating Rept for Aug 1979
ML19275A252
Person / Time
Site: Arkansas Nuclear 
Issue date: 09/24/1979
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
References
NUDOCS 7910030406
Download: ML19275A252 (2)


Text

-

l ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501)371-4000 September 24, 1979 2-099-18 Mr. Norman M. Haller, Director Office of Management and Program Analysis U. S. Nuclear Regulatory Comission Washington, D. C.

20555

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Monthly Operating Report - Correction (File:

2-0520.1)

Gentlemen:

A. cached find the Monthly Operating Report Correction for August,1979, for Arkansas Nuclear One - Unit 2.

This confirms information given to your staff last week.

Please accept our apology for any inconvenience this may have caused.

Very truly yours, eD& (.V David C. Trimble Manager, Licensing DCT/REI/vb Attachment cc: Mr. K. V. Seyfrit, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 lg 7

4 o,

Mr. Victo* Stello, Jr., Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission

\\

<Q Washington, D. C.

20555 7910030%9/0

[

vevsemcca scur-uriur es mrw

I DOCKET NO.

50-368 UNIT SiluTDOWNS AND POWER REDUCTIONS ANO-Unit 2 UNIT NAME DATE 9/12/79 REM)RT MONTil August COMPLETED BY R. A. Pendergraf t TELEPif0NE 501-968-2519 r

"t.

5 ?

3 2[

Licensec Cause & Currecieve N.

Daic i

3g 4

2s&

Even 37 g?

Atisonio 3'

Picseni Recursence y

5 j;ji g Repors a mu d

79-18 790807 F

8.6 A

3 NA RB CRDRVE Inadvertent Rod Drop 79-19 790811 F

82.3 A

3 N ".

HJ INSTRO Level Switch Failure 79-20 790818 F

42.5 A

3 NA IA INSTRU Power Supply Interrupt to CEAC #1

- - CORRECTION -

M l

3 4

Q l ForteJ Reason:

Method:

Exhibit G Instrutiions S Soln d oled A-l.quipmen Failure ( Explain)

I-Manual for Pseparainm of Daia N

li Mainierunce or Tes 2 Manual Sciam.

Ents) Sheels io: i scensee O

c-Refociing 3 Aoiomaiic s.,am.

E,eni Repo,i ii i Ri i sie isi Ri G

.m A~

.3 D-Regulaios) Restristion 4-Ot her ( E splain )

Oltil i

%D I Operator Traimng & luense I umination N

I - Ad muusirai n e 5

,y m

G-Operation.nl I s eus (l'splaio )

Eshibit 1 Same Souice

%5 P8/77)

II Other (E xplam)

IN LJ1