ML19274G189
| ML19274G189 | |
| Person / Time | |
|---|---|
| Site: | 07106272 |
| Issue date: | 08/02/1979 |
| From: | Baer T U.S. ECOLOGY, INC. (FORMERLY NUCLEAR ENGINEERING |
| To: | Macdonald C NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 7908300376 | |
| Download: ML19274G189 (2) | |
Text
2 po L 7/- c 7 z m
-m
-n
- gO Nucfear;=Musilleerilig Compa11.n Inc.
s,co ss rLe,wf ta ngo, su,1E,,e. g. c eox,, e
'CT*Iu lNyt L L E. K E N T U C K Y 40207 P-ON E 15o2) 426-7160
- In f%.
August 2, 1979 Charles E. MacDonald, Chief Transportation Branch Division of Fuel Cycle and Material Safety U.
S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. MacDonald:
It has ccme to our attention that Nuclear Engineering Company has been removed from the list of users of the following transportation packages for which certificates of Complaince have been issued:
Package Name Certificate of Comolaince B-3 6058 B-2 6144 Poly Panther 6272 Supertiger 6400 Half Supertiger 6679 Nuclear Engineering Company owns one or more of each of the above packages and rents these packages to generators of radio-active waste.
These packages, owned by Nuclear Engineering Company, are then 1:.tilized to transport radioactive materials to either Nuclear Engineering Company's radioactive waste disposal sites or the Barnwell, South Carolina radioactive waste disposal site.
In order for Nuclear Engineering Ccapany to properly maintain the equipment and to stay abreast of any changes which may occur p
in the Certificates of Compliance, Nuclear Engineering Company must be listed as a user of these packages.
2032 159 E EXEWI d e Jl - #6- (
q
'M hww AlY v
'l908300374 137.'O
-4 J
Charles E. MacDonald, Chief August 2, 1979 Page 2 As we understand it, the confusion in Nuclear Engineering Company's user status has arisen from the transfer of Nuclear Engineering Company's former subsidiary, Protective Packaging, Inc., to Teledyne Energy Systems.
Teledyne Energy Systems is not a user of the packages but is a designer and f abricator of these and other transportation packages.
Teledyne Energy Systems does not currently own or possess any package for which a Certificate of Compliance has been issued.
Nuclear Engineering Company does wish to renew the Certificate, /
of Ccznpliance for each of the above listed packages.
If V
Teledyne Energy Systems does not wish to bear the expense of submitting the renewal application then Nuclear Engineering Company wishes to submit the application Sincerely, NUCLEAR ENGINEERING COMPANY, INC.
- 20 O'h Thomas S. Baer Vice President TSB/lkb cc:
R. L. Armbruster 2032 iAU U+
sock.arnitgineeriusoxnpain iix.
y