Forwards Revision 2 to Rept on Reanalysis at Safety- Related Piping Sys.
ML19274F296
Person / Time
Site: Beaver Valley
Issue date: 07/18/1979
From: Dunn C
DUQUESNE LIGHT CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19274F297 List:
References
TAC-42636, NUDOCS 7907200472
Download: ML19274F296 (3)


Text

'

  • ^

g,w, e

p V# '

Duquesne Usht m s, . u..,-

,m, _

I' fisbu rgh. P4 15219 July 18, 1979 Mr. Harold R. Denton Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention: A. Schwencer, Chief Operating Reactors' Branch No. 1 Division of Operating Reactors Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Request to Modify the Commission's March 13,.1979

" Order to Show Cause" Gentlemen:

Enclosed are three (3) signed originals and thirty-seven (37) copics of Revision 2 to the " Report on the Reanalysis of Safety Related Piping Systems for Ecaver Valley No. 1 Unit". This revision consists of replacement pages to the original rcport submitted to you on June 19, 1979 and includes responses to certain questions received from the staff in a telephone conversation on July 13, 1979. The changes included herein resolve four (4) minor inconsistencies fc,und in the report.

It is our understanding that upon receipt of this revision to the report, all of the staff's concerns with respect to the reanalysis effort will be satisfied, and we, therefore, request that so much of the Commission's March 13, 1979 Order which requires the plant to remain in a shutdown condition be modified at this time to permit interim operation of the unit until the time for refueling.

Very truly yours,

( n u C. N. Dunn Vice President, Operations Enclosure 790720cWL

,...-...w- ,  % - - - - e-.

(CORPORATE SEAL)

Attest:

YkH.W. M' 5'taas Secretary CO!O10NWEALTH OF PENNSYLVANIA)

) SS:

COUNTY OF ALLEGENY )

On this /# '~~~~ day of v v4/ , 1979, before me, LONALD W. SHANNON , a Notary Public in and for said Common-wealth and County, personally appeared C. N. Dunn, who being duly sworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.

\. / m- /LA 0% . , - - -

DONALD W. SHANNON, NOTARY PUBLIC PITTSBURCH ALLEGHENY COUNTY MY COMMISSION EXPIRES JUNE 7,1983 Member, Pennsylvana Associaten of Noures

3EAVER VALLEY PO'JER STATION, UNIT 1 Revision 2 INSTRUTTIONS FOR ADDING EEVISION 1 TO THE PEFOPT ON THE REANALYSIS OF SATETY-RELATED FIPING SYSTEMS The following listing vill serve as a checklist for entering the attached pages into the report. The items listed in the " REMOVE" column should be removed from the report and replaced with the items in the " ENTER" column.

Vertical bars (change bars) have been placed in the outside margins of revised text pages and tables to show the location of any technical changes originating with this amendment. Some pages bear a new acendment designation, but no change bars, because revisions en other pages in that section caused a text shift. A few unrevised pages have been reprinted because they fall within a run of closely spaced revised pages. No change bars are used on figures or on nri sections, appendices, questions and responses, etc. Change bars from previous amendments have been deleted on pages revised by this amendment. The instruction sheet and co"er letter should be filed at the beginning of the report.

REMOVE ENTER Title page Title page

p. 1-1 p. 1-1
p. 3-25 p. 3-25
p. 4-1 and 4-2 p. 4-1 and 4-2 Table 4-1 (pages 6 and 8) Table 4-1 (pages 6 and 8)
p. 5-1 p. 5-1 Table B-2 (1 page) Table B-2 (2 pages)

D-1 D-1 Fig. 6.4-1 (Appendix D) Fig. 6.4-1 (Appendix D)

Fig. 9.9-1B (Appendix D) Fig. 9.9-1B (Appendix D) 1