Summarizes Status of Evaluation of Significant Deficiency Re S&M Constructors,Inc QA Program.Work on Intake Structures Continuing;Final Rept Delayed Until 790831
ML19274F049
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 05/29/1979
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7906080257
Download: ML19274F049 (1)


Text

t 5

ILLU VIN ATING BLOG. e PUBUC SOUARE e CLEVELAND, OHIO 44101 e TELEPHONE (216) 623-1350 e MAIL ADDRESS. P.O. box 5000 Daiwyn R. DaviasOn

, ct mc sw.r 5 5 TE M EN I *.E E R AG A'.O C ON STPcCh ;N May 29, 1979 Mr. James G. Keppler, Director of Region III Office of Inspection and Enforcenent United States Nuclear Regulatory Cc= mission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-M0; 50-W1 Significant Deficiency RE: S & M Constructors, Inc.'s Quality Assurance Program Relative to Control of S & M Subcentractor: 2he Halvorsen Eoiler and Engineering Cc=pany

Dear Mr. Keppler:

The Interi= Report regarding subject significant deficiency states the Final Report is scheduled to be in your office by June 1,1979 As discussed with Mr. J. Konklin on May 23, 1979, we are continuing our evaluation of the Intake Structures. Until this evaluation is ca=pleted, our Final Report cannot be completed.

It is anticipated that the evaluation vill be completed so that a Final Report can be submitted by August 31, 1979 Very tmly yours,

.: ' ' .. -4.m D. R. Davidson, Vice President-Systen Engineering and Construction  :