Text
156',i' 1' s *]
l ILLUMINATING BLOG e PUBLIC SOUARE e CLEVELAND. OH1'l 44101 e TELEPHONE (216) 623-1350 e Mall ADDRESS.
P. O. 80x 5000 I
Dalwyn R. Davidson viCF PRESrDE NT Svs t[ M E NG:NE E 4 *.G AND C C'.S t ku; tic N Mr. James G. Keppler, Director EeSion III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Glen Ellyn, Illinois 60137 Re:
Perry Nuclear Power Plant Docket Nos. 50-4h0; 50-k41 IE Eulletin No. 79-03
Dear Mr. Keppler:
In accordance with your request, the following information is provided in response to IE Bulletin No. 79-03 First, our balance of plant piping contractor has purchased no material from Youngstown Welding and Engineering Company (including any AS!G SA-312 type 304 & 316 stainless steel piping) for use on the Perry Project.
In addition, we have no plans of using ASME SA-312 type 304 pipe in safety-related systems at our facility.
Secondly, our USSS supplier's material specifications require that piping used in our safety-related systems be rolled and welded with filler material or be seat.less piping.
These material specifications do not permit the usage of type SA-312 piping for this application.
We conclude, therefore, that IE Bulletin 79-03 does not affect the Perry Project.
Very truly yours, Q
0
/b Ebet v Il >
e l};;i
- )}
/
Dalwyn R. Davidson Vice President Systems Engineering and Construction DRD/c=w cc: John G. Davis, Acting Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Comnission Washington, D. C. 20555 fg 1979 790607009%,