05000338/LER-1979-038-03, /03L-0 on 790323:axial Flux Difference Outside 5% Target Band Due to Shutdown in Progress.Flux Difference Was Restored to Normal Range within Three Minutes by Boration

From kanterella
(Redirected from ML19274E794)
Jump to navigation Jump to search
/03L-0 on 790323:axial Flux Difference Outside 5% Target Band Due to Shutdown in Progress.Flux Difference Was Restored to Normal Range within Three Minutes by Boration
ML19274E794
Person / Time
Site: North Anna 
Issue date: 04/18/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19274E780 List:
References
LER-79-038-03L, LER-79-38-3L, NUDOCS 7904240421
Download: ML19274E794 (2)


LER-1979-038, /03L-0 on 790323:axial Flux Difference Outside 5% Target Band Due to Shutdown in Progress.Flux Difference Was Restored to Normal Range within Three Minutes by Boration
Event date:
Report date:
3381979038R03 - NRC Website

text

NHC F ORM 360 U. 5. NUCLE AH REGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT CoNTHOL DLOCm l l

l l

l l

lh (PLE ASE PRINT OR TYPE ALL HEQUIRED INFORMATION) 1 b

lVlAlNlAlS[1lgl0l0l-l0 0l0l0l0l-l0l0[gl4l1l1l1l1lgl l

lg o i 7

8 9 LICENSEE COOL I4 15 LICENSE NUMULH 25 iti LICENSE IvPL JO

$7 L A T b8 CON'T gPOfu L g 0;5l0[0;0l3;3l8lg 0 3l2[3;7l9 jg g 3l 3] gj 7 9 lg o i 7

8 60 61 DOCKE T NUMBE H

'ul W

tVENT DATE 74 lb HEPOH1 DATE 80 EVENT DESCRIPTION AND PROH ABLE CONSEQUENCES h l On 3-23-79 during a shift from Mode I to Mode II operation, the axial flux difference i o 2 l was outside the + 5% target band established by T.S. 3.2.1.

Total time out of the l

o 3 l required band was 3 minutes. A total of 3 penalty deviations minutes were accumulated; o 4 This event is

[

ns,j l The health and safety of the general public were not affected.

I reportable as per T.S. 6.9.1.9.b.

o o o 7 l

l I

F6Fl I 80 7

8 9 C DE COIE SUSCO E COMPONENT CODE SUUC DL SU

)DE lol9l l Rl Cl@ W@ l Z l@ [Z lZ Z lZ lZ [Z l@ l Zl@ l Z l@

7 8

9 10 11 12 13 18 i9 20 SEQUE'4 TI AL OCCUnAENCE HEPCHT H E VISION t E R HO EVENT YE AR REPOHTNO.

CODE TYPE NO.

@ ag,1, 17 l 9 l l--J l0 3 8l M

l 0131 lLl l-l 0l

_ 21 21

.J 24 16 21 2d 29 Jo 31 31 AKE A 1 r O J PL A 1 Pt T4 HOUHS 22 SUB TT 3 FO i U ts.

SUPPL 1 ft f.1 N FA Tt 5 EH Lx_j@l Z l@

lZl@

IZ @

10 1010 oI 0@

LliJO IZl@

lZ l9 9 l9 l@

33 34 35 36 J/

40 41 42 43 44 47 CAUSE DESCRIPTION AND COHHECTIVE ACTIONS h 1: 101 l The axial flux diffgrenneJting out of.its target band was. due tn tho I

i I shutdown in proqress.

Immediate corrective action was ta_ restore the axial fluy I

ii12i differencc to within its band within 3 min._.by_bora. tion.

I i a I

tilAli 80 7

8 9 ST S

% POWE R OTHE R ST ATUS DISC i

DISCOVEHY DESCHIPTION l' I s l l_Dj@ l O l 6 l 8 @l N/A l

l A l@l Operator Observation l

8 As.viTY CO rtNT RELEASED OF HELE ASE AMOUNT OF ACTIVITY LOCATION OF RELEASE W @ [Z_j @ l N/A l

l N/A l

i c 7

8 9 10 11 44 45 80 PE HSONNEL E XPOSUHE S NUMilE R TYPE DE SCRIPTION 10l0l0j@[Z_J@l NA j

i 7

=

,E n SO~ N d',N;U,f,E S OESCHiPnON@

NUYetn 0l0l0l@l N/A l

$ H 7

8 9 11 12 0

LOSS OF OH D AM AGE T O F ACILI TY 1 (P E DE SCHIP T ION lZl@l N/A l

i 9 80 7

8 9 10 oE sCnienON @

7904240694 N HC UsE ON L'i' PUB L lClT Y iSSUEn LNJ81 N/A l

ll lll; llljjy 2 o 68 69 80 5 7

8 9 10 703-894-5151 2,

NAME OF PREPAHER PHONE:

Virginia Electric and Power Company North Anna Power Station, Unit #1

Attachment:

Page 1 of 1 Docket No.

50-338 Report No.

79-38/03L-0

Description of Event

On 3-23-79 during a shift from Mode I to Mode II' operation, the axial flux difference (AFD) was noticed to be outside t:1e 1 5% target band established by T.S. 3.2.1.

Actions were immediately taken to restore the AFD within its band. The total time the AFD was out of its band was 3 minutes.

Probable Consequence of Occurrence Axial flux indication is used to monitor in core flux shapes and to ensure abnormal flux shapes do not occur which could lead to exceeding hot channel factors.

If AFD is outside its target band, operational restrictions are placed on plant operations. None of these operating restrictions were exceeded, therefore the health and safety of the general public were not affected.

Cause

The cause for AFD exceeding its target band limits was the reactor shutdown that was in progress.

Immediate Corrective Actions

Returned AFD to within its, target band within 3 minutes by boration.

Scheduled Corrective Actions No further action required.

Action Taken to Prevent Recurrence No action required.