Monthly Operating Rept for Mar 1979
ML19274E755
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/13/1979
From: Shively C
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19274E754 List:
References
NUDOCS 7904240315
Download: ML19274E755 (4)


Text

' '

AVER AGE DAILY UNIT POWER LEVEL DOCKET NO. 50-313 UNIT ANO-1 DATE April 13, 1979 COMPLETED BY C.N. Shively TELEPilONE 501/968-2519 MONTil March DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL

(%f We-Net) (MWe Net i 1 809 7 808 2 808 795 3

3 770 39 807 4 715 ,o 810 s 807 y, 810 807 809 6 22 7 808 23 808 8 808 808 24

  • 25 805 10 809 26 805
811 804 2-i, 809 804 28 13 R06 29 And 14 804 - 30 618 15 805 0

-- 31 16 805 INSTRUCTIONS On rhn format,hst the neuse dai!3 or:n p.,wer leulin MWe-Net f(n cacji day m the reporting month. Lompute to the nearest whote megawaii, (9/771 790 4240315

OPERATING DATA REPORT DOCKET NO 50-313

') A TE A0ril 13 1979 CO3!PLETED BY C.N.Shively TELEPHONE E01 N 9-2519 OPERATING STATUS

1. Unit Name: Arkansas Nuclear One - Unit 1 Not"
2. Reporting Period: March 1-31, 1979
3. Licensed Thermal Power tMht).
4. Nameplate Rating (Gross MWe): 002 74
5. Design Electrical Rating (Net MWe): 850
6. Maximum Dependable Capacity (Gross MWe): 883
7. Maximum Dependable Capacity (Net MWe): 836
8. If Changes Occur in Carucity Ratings (Irems Number 3 Through 7) Since Last Report.Gne Reasons:

None

9. Pouer Lese! To which Restricted If Any (Net MWe): _

None

10. Reasons For Restrictions. lf Any: NA This Month Yr .to.Date Cumulatise
11. Hours in Reporting Period 744.0 2160.0 37531.0
12. Number Of Hours Reactor has Critical 716.2 1296.0 27006.1 13 Reactor Resene Shutdown llours 0.0 614.4 2604.3 14, ifours Generator On.Line 716.6 1272.5 26486.2
15. Unit Reserve Shutdown Hours 0.0 0.0 205.2
16. Gross Thermal Energy Generated (MWH) 1815922.0 3182545.0 63989254.0 l' Gross Electrical Energy Generated (MWH) 599358.0 .

1049078.0 21289759.0 lb. Net Electrical Energy Generated (MWH) b/3Iad.U _ _ _ . 1002362.0 20312908.0

19. Unit Sen-ice Factor 3D*# DO 9 70,6
20. Unit Availability Factor 96.3 58.9 11.1
21. Unit Capacity Factor (Using MDC Net) 92.1 55.5 64.7
22. Unit Capacity Factor (Using DER Net) 90 b b4.6 63.7 23 Unit Forced Outage Rate 0.0 40.3 13.0
24. Shutdowns Scheduled Oser Next 6 Months (Type, Date,and Duration of Each):

Schedule' Refuelina : Startina March 30, 1979; 8 weeks

25. If Shur Down At End Of Report Period, Esiimated Date of Startup: May 25, 1979
26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITI-\ L CRITICA LITY INITIAL ELECTRICITY CO\l\f ERCI A L OPER ATION (9/77 )

UNir slau1 downs AND POhER REDUCTIONS DOCKET NO. 50-313 ',

Ut T N A3tE ElQ-Unit I orrE _4Ll 3 / 79 C. fl. ShivelY March CO%iPLETED BY REPOR T NtON fil TELEPilONE 501-968-2119_.

=

z N. i

, {? 3 4 h" ~4 Laensee ,E n., E 't Caine A Corretine Da t e i 5? 4 2i5 Event  : f si At tnin to H

j C_ E Report : EU 5' Present Retu rcnte 3 5 :!

< G d

79-1 790330 S 27.4 C 1 ft/A ti/A fl/A ft/A c==$

r

(

6 Q

2; ';)

Cv/

tg'/#

u I 2 3 4 f Forsed Reason klethod Esinha G - In>rinctmm S. Scheduled A.l~.;niprnent failure ( E x plain) 141an nat for Preparanon of Data B.htaintenance or Test 2 4tanual Scrain Entn Sheets Ier Luense C Ref uchng 3- Autinnatie Scrain. L. cur Report t Ll R t l~de (Nt.'Rt G D Regulatory Ecs::htion 4-Otlic t ( L splain ) 01 t'l 1

1. Operator Trainine 1 i nente 1.unnnarron F b!nunnt rae r.c 5 G 0;w: rational 1.r ror ( E spl n.i t E sh:t o I Sin. Sonu s

("/77) 110:hcr t 1.xpland

REFUELING INFORMATION

^ "

1. Name of facility. Arkansas Nuclear One - Unit 1
2. Scheduled date for next refueling shutdown. 03-30-79
3. Scheduled date for restart following ref ueling. 05- 25-79
4. Will refueling or resu=ption of operation thereafter require a technical specification change or other license atendment?

If answer is yes, what, in general, will these be?

If answer is no, has the reload fuel design and core configuration been reviewed by your Plant Safety Review Coc=1ttee to determine whether any unreviewed safety questions are associated with the core relocd (Ref. 10 CFR Section 50.59)?

Yes. see letter to Peid dated 11-9-78.

5. Scheduled date(s) for submitting proposed licensing action and supporting inf ortation. 11-9-78 (Actual)
6. Important licensing considerations associated with refueling, e.g. ,

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Will reload 64 fresh fuel assemblies and operate for approx-imately 16 months.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool, a) 177 b) 112
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.

present 590 increase size by n

9. The projected date of the last refueling that can be discharged to the cpent fuel pool cssu=ing the present licensed capacity.

DATE: p,rch lopq

NRC MONTHLY OPERA"ING REPORT Operating Summary - March,1979 Unit I The Unit load was reduced to approximately 85% reactor power on 3/3/79 due to feedwater heater ESB tube leaks. Repairs were made and the Unit was returned to full power on 3/4/79. On 3/6/79, at 2145 hours0.0248 days <br />0.596 hours <br />0.00355 weeks <br />8.161725e-4 months <br />, an auto-matic runback was initiated by the Control Rod Drive Control System due to an ir-limit indication on Group #4 CRAs. The indication was ftIse, as there .<as no rod nisalignment. Operations teminated runback at 91%

by taking manual control and overriding the automatic functions. The in-limit cleared and did not recur. The Unit was returned to full power operation and nomal operation continued until 3/18/79, when the P8A heater drain pump shaf t seal packing failed. The Unit load was reduced to 92%, repairs were made, and the Unit was returned to full power within six hours. The Unit operated throughout the remainder of tne month with-out incident.