ML19274E478

From kanterella
Jump to navigation Jump to search
Forwards Revised Chapter 8 of Physical Security Plan Which Provides Details of Safeguards Contingency Plan.Plan Withheld (Ref 10CFR2.790)
ML19274E478
Person / Time
Site: Beaver Valley
Issue date: 03/22/1979
From: Woolever E
DUQUESNE LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 7903260240
Download: ML19274E478 (1)


Text

ENCLOSURES TRANSMITTED HEREWITli Il CONTAIN 10CFR 2.790 INFOR'1ATION

'Af M 9,2) ce.ccco 435 5 atn Avenue Pittsburgh, Pennsylvania 1:20 March 22, 1979 Director of Nuclear Reactor Regulation United States Nuclear Regulatorf Commissica Attention: A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors Washington, D. C. 20335

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Safeguards Contingency Plan Gentlemen:

Enclosed are five (5) copies of a revised Chapter 8 of the Physical Security ?lan for the Beaver Valley Power Station.

This revised Chapter provides the details of the Safeguard; Centingency Plan which were outlined in our February 21, 1979 submittal. This revision provides the Safeguards Contingency Plan required by 10CFR73.40 and Appendix C to Part 73.

The pages numbered 8-1 through 8-3 and labeled Issue 2, Revision 3 should be replaced with these enclosed pages nu=bered 8-1 through 8-59 and labeled Issue 2, Revision 4.

We consider this submittal as a clarification of the original submittal, and do not believe that the fee requirements of 10CFR170.22 are applicable to this submittal.

The enclosed material is considered proprietary under the provisions of 10CFR2.790(d), and are thereby exempt from public disclosure.

If you have any question concerning this matter, please contact the office of C. N. Dunn.

Very truly yours,

/

E. Woolever Vice President

\

Enclosures lSip /

7 9 0 3 2 6 0 2 'fo