ML19274E235
| ML19274E235 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 03/15/1979 |
| From: | Merson S BALTIMORE GAS & ELECTRIC CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML15261A044 | List: |
| References | |
| NUDOCS 7903210011 | |
| Download: ML19274E235 (1) | |
Text
J s
BALTIMORE.
GAS AND h ELECTRIC i CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 ELECTRIC PRoDUCTioH DEPARTMENT March 15, 1979 Director Office of Management and Program Control U. S. Nuclear Regu.latory Comission 7735 Old Georgetown Road Bethesda, MD 20015 Gentlemen:
Enclosed herewith is the February,1979, Operation Status Report for Calvert Cliffs No.1 Unit, (Docket 50-317) and Calvert Cliffs No. 2 Unit, (Docket 50-318).
Sincerely,
/
S. E. Merson, Performance Data Coordinator Production Econony and Resulta Unit Electric Production Department SDM/bl Enclosure Directorate of Regulatory Operations cc:
Region L U. S. Nuclear Regulatory Commission S. M. Long Power Plant Siting - MD L. B. Russell A. M. Maszaros G. K. Wotzel, Jr.
A. E. Lundvall, Jr.
T. Cintullo S4\\
\\
790321001\\
3