Responds to NRC Requesting Util to Review Factual Accuracy of Two Draft Systematic Evaluation Program Evaluations.Finds Drafts Substantively Correct Re Current Plant Design Features.Battery Discharge Test Was Omitted
ML19274D960
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/16/1979
From: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
TASK-02-02.C, TASK-08-03.B, TASK-2-2.C, TASK-8-3.B, TASK-RR NUDOCS 7902270294
Download: ML19274D960 (1)


Text

.

ONNECTICUT YANKEE ATOMIC POWER COMPANY BERLIN, C O N N ECTIC U T P. O. BOX 270 H ARTFORD. CONN ECTICUT 06101 203 666 6 11 February 16, 1979 Docket No. 50-213 Director of Nuclear Reactor Regulation Attn: Mr. D. L. Ziemann, Chief Operating Reactors Branch #2 U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Reference:

(1)

D. L. Ziemann letter to W. G. Counsil dated January 16, 1979.

Gentlemen:

Haddam Neck Plant Systematic Evaluation Program (SEP)

In Reference (1), the NRC Staff requested that Connecticut Yankee Atomic Power Company (CYAPC0) review the factual correctness of two draft SEP topic evalu-ations; one pertaining to atmospheric transport and diffusion characteristics (X/Q),anc the other relating,to station battery capacity testing.

In response to that request, our review has indicated that two drafts are sub-stantively correct with respect to the discussion of current design features and requirements at the Haddam Neck Plant.

It should be noted, however, that although not included in the Technical Specifications, a battery discharge test is perfonned during every refueling outage, per Procedure PM9.5-19.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY

$//l %nn )

W. G. Counsil Vice President 79022702W