ML19274D910

From kanterella
Jump to navigation Jump to search
Forwards LERs 79-004/03L-0,79-005/03L-0 & 79-006/03L-0
Date released: 10/15/2019 Download: ML19274D910


LER 79-006/03L-0 on 790123:during Maint on Boron Injection Tank Inlet Valve Q1E21VO16B,boron Concentration Fell Below Tech Spec Requirements.Caused by Leakage Through Opened Valve During Troubleshooting Per LER 79-005/03L-0
ML19274D915
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/21/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D915 (3)
LER 79-005/03L-0 on 790123:during Surveillance Test on Boron Injection Tank Inlet Valve Q1E32V016B,valve Failed to Operate Electrically.Cause Undetermined,Since Subsequent Troubleshooting Failed to Duplicate Problem
ML19274D914
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/21/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D914 (1)
LER 79-004/03L-0 on 790123:containment Atmosphere Particulate Radioactivity Monitoring Sys Inoperable;Filter Paper Was Not Advancing.Caused by Replacement Paper Being Thicker That That Originally Supplied
ML19274D911
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/21/1979
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D911 (1)
Forwards LERs 79-004/03L-0,79-005/03L-0 & 79-006/03L-0
ML19274D909
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/21/1979
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19274D909 (1)