Requests Extension to 790501 for Preparation of Offsite Dose Calculation Manual Because of Conflicting Commitments & Time Constraints
ML19274D309
Person / Time
Site: Pilgrim
Issue date: 01/16/1979
From: Andognini G
BOSTON EDISON CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
NUDOCS 7901230149
Download: ML19274D309 (2)


Text

.i g e

~

BOSTON EDICON COMPANY oENERAL oFrsCta Boo BOYLETON GTREET B O S TO N, M AES ACHu mETTs o 219 9 G. CARL ANDOGNING MANAGER NUCLEAR OPERATIONS DEPARTMENT January 16, 1979 BECo. Ltr. #79-27 Mr. Thomas A. Ippolito, Chie f Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C. 20555 License No. DPR-35 Docket No. 50-293 Request for an Extension to the Offsite Dose Calculation Manual

Dear Sir:

In a letter to all Boiling Water Reactor Licensees, dated November 15, 1978, you presented substantive revisions to the Draft Radiological Effluent Tech-nical Specifications, that were originally sent to Boston Edison Company on July 11, 1978. The major difference in these specifications from the previous ones, was the removal from the specifications of the equations for dose cal-culations, setpoint determination and meteoroligical dispersion factors. These items are now required to be included in the Offsite Dose Calculation Manual (ODCM) to be prepared by the licensee and submitted for review and approval along with proposed Technical Specifications by February 13, 1979.

The preparation of the ODCM involves both our Health Physics and Environmental Science Groups, who during this same time frame must prepare the following reports:

- Semi-annual Effluent and Waste Disposal Report (Reg. Guide 1.21)

- Environmental Monitoring Report

- Man-Rem and Dose Distribution Report (116 Report)

- Dose Distribution by Exposure Categories Report (20.407 report)

- Inhouse ALARA Report 2

\

0

?S0123od9 f

BOSTON EDISON COMPANY Mr. Thomas A. Ippolito, Chief January 16, 1979 Page 2 Therefore, due to the coexistence of these commitments and the time constraints involved, Boston Edison Company requests an extension to the ODQ1 submittal date until May 1, 1979.

We trust that this new schedule is acceptable to you. If you should have any questions pertaining to this request, please contact us.

Very truly yours, g(( & W0