ML19274D227
| ML19274D227 | |
| Person / Time | |
|---|---|
| Site: | 07100258 |
| Issue date: | 12/27/1978 |
| From: | Baer T U.S. ECOLOGY, INC. (FORMERLY NUCLEAR ENGINEERING |
| To: | Dircks W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML19274D228 | List: |
| References | |
| NUDOCS 7901160317 | |
| Download: ML19274D227 (1) | |
Text
%y JHw. G :( s2 -2 9-7,
r fht 7 - ozs2 T
Nttclear Entuncerinp; Company. Inc...a f{gO eroo snctovvitec noxo. suire 32e. = 0. oox 724s
'g -
LOUISVILuc KENTUCKY 40207 P H o N E 1502) 42(5 - 7 t G,0 ;,
ll} ll 49 December 27A'.1978 U-U10:1 3
Mr. William J. Dircks, Director Office of Nuclear Materials j
Safety and Safeguards U. S. Nuclear Regulatory Commission i
Washington, D.
C. 20555
Dear Mr. Dircks:
In satisfaction of the requirements of 10 CFR S 71.51, i
we enclose seven (7) copies of the Nuclear Engineering Com-pany, Inc. (NECO) Quality Assurance Manual.
l We understand that for purposes of the regulations in Part-71, the quality assurance program described in the Manual is considered to be approved until such time as final action is taken by the Commission.
Should you have any questions concerning the program, please feel free to contact me directly.
Sincerely, NUCLSAR ENGINEERING COMPANY, INC.
=. L shM.:y '
~w...,>
Thomas S. Baer Vice President TSB/cf Enclosures (7) 9 9f.s,y y
N8' y0\\
=
m:c G %:)h ?s1979 >
%c;;?
q 4
ca 74
- c. 9 c-
+ u t.r.)
7 9 0116 0 31~/