ML19273C194

From kanterella
Jump to navigation Jump to search
Forwards Significant Const Deficiency 14 Interim Rept, Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4.
Date released: 10/14/2019 Download: ML19273C194


Significant Const Deficiency 14 Interim Rept, Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4. Caused by Fatigue Produced by Typical Dynamic Events.Matl Returned to Manufacturer for Repair
ML19273C195
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/29/1979
From: Costello J, Cruich J, Milhiser R
LOUISIANA POWER & LIGHT CO.
To:
References
Download: ML19273C195 (3)
Forwards Significant Const Deficiency 14 Interim Rept, Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4.
ML19273C193
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/08/1979
From: Aswell D
LOUISIANA POWER & LIGHT CO.
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19273C193 (1)